The response deadline has passed. Review the details for future reference or to track similar opportunities.
The Department of Veterans Affairs is contracting for the removal and replacement of the pressure reducing valve station at Building 200 of the VA Sepulveda Ambulatory Care Center. This project involves upgrading the deteriorating high-pressure steam piping system, including the installation of new steam regulators, traps, and associated piping. The work must be completed within 90 days and is set aside for Service-Disabled Veteran-Owned Small Businesses.
The project involves the removal and replacement of the pressure reducing valve station, including the installation of new steam regulators, traps, and associated piping.
1. This is a combined for commercial services/items prepared in accordance with the format in FAR Subpart 12.6 in conjunction with FAR Part 13, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a separate written solicitation will not be issued. 1.a. Project Title: High Pressure Steam Piping Replacement 1.b. Description: VA Greater Los Angeles Healthcare System is seeking a contractor to remove and replace the pressure reducing valve station at Building 200 of the VA Sepulveda Ambulatory Care Center. 1.c. Project Location: VA Sepulveda Ambulatory Care Center 1.d. Solicitation Type - Number: Request for Quotes (RFQ) - 36C26226Q0990. 1.e. Set Aside: This solicitation is issued as an SDVOSB set aside. 1.f. Applicable NAICS code: 238220, Plumbing, Heating and Air-Conditioning Contractors. 1.g. Small Business Size Standard: $19 million 1.h. Type of Contract: Firm Fixed Price 1.i.
Period of Performance: 90 days 1.j. Wage Determination applicable to this project: SCA WD 2015-5613 revision 32 1.k. Request for Information (RFI) should be submitted via email no later than 2pm PST Monday, June 29th, 2026, to [email protected] 1.l. Job walk will be conducted at 10am on Thursday, June 25th, 2026. Participants will meet with Dexter Jones at Building 200, VA Sepulveda Ambulatory Care Center, 16111 Plummer St, North Hills, CA 91343. Please reach out to Dexter Jones at (747) 202-8826 if you need to locate the meeting point. The location map can be found in the
attachments. Please to indicate intent to participate 1.m. Offers will be evaluated utilizing price-only with special-standards-of-responsibility. Offerors who fail to meet any special standard of responsibility will not be eligible to receive contract award. 2. Statement of Work 2.1.
Objective. VA Greater Los Angeles Healthcare System is seeking a contractor to remove and replace the pressure-reducing valve station at Building 200 of the VA Sepulveda Ambulatory Care Center. 2.2.
Background. The high-pressure steam piping system is deteriorating and the valves require replacement. The valves no longer seal to stop steam from entering the building. The traps and piping are also deteriorated and require replacement. . 2.3. Scope. This project consists of the removal and replacement of Pressure Reducing Valve Station at VA Sepulveda Building 200. The existing parts will be replaced with new Armstrong GP-2000 Carbon Steel steam regulators, along with associated steam traps, piping, and fittings. We will also be installing a new Quadax isolation valve on the station. Contractor must be able to provide this brand name or equivalent equipment if it meets the specifications attached to the solicitation. The equipment must be either forged or cast steel (no cast iron) Equipment to be Installed in Building 200 (2) Armstrong Steam Regulators (2) Globe Valves, Carbon Steel (2) Titan Y-strainers with Blowdown (2) Armstrong Drip Trap assemblies (2) Quadax Isolation Valves, Carbon Steel All new pipes, valves, and fittings to replace outdated or corroded components and improve system accessibility. Contractor must perform the following tasks: Demolition Isolate steam& condensate system at the point of connection. Disconnect existing steam pressure regulators assemblies, steam trap assemblies, and associated piping. Remove old parts and related components from the site. Installation Install two new Armstrong GP-2000CS Steam Pressure Regulators Install two new Globe Valves on bypasses, carbon steel Install two new Titan Y-strainers with blowdown, carbon steel Install two new Quadax Butterfly Quad Gate Valve FLG 150 Carbon Steel/Stainless Steel Gear Operated Install two new Armstrong TVS-4000 with 2011 Drip steam traps. Replace and reconfigure piping, valves, and fittings as necessary to improve layout for serviceability. Ensure all new components are installed to manufacturer specifications and in accordance with applicable codes and VA standards. Sequencing & Phasing Phase 1 (Weekend work): Install first steam pressure regulator assembly and minimize disruption to building operations. Phase 2 (Weekend work): Install second steam pressure regulator assembly and minimize disruption to building operations. Insulation / Pipe Labeling Insulate all new piping with 1.5 thick fiberglass insulation and aluminum jacketing Label all new piping with media type and flow direction Insulation install should take 1 - 2 days to complete Testing & Start-Up Perform pressure testing on all new piping. Verify operation of both steam pressure regulators and steam trap assemblies. Check system for leaks, proper flow, and pressure setpoints. Safety & Compliance Follow all VA safety protocols, OSHA
requirements. Maintain clean work areas and always ensure safe access routes. Comply with VA hot work permit
Get matched to contracts like this daily
Free AI-powered contract matching for your business.