The Department of Energy is procuring the installation of a 115kV disconnect switch at the North Gunnison Substation to enhance operational flexibility and maintenance capabilities for the electrical substation equipment. Key requirements include demolition, site development, and the installation of various structural components and associated equipment.
The project involves the installation of a 115kV disconnect switch at the North Gunnison Substation, including demolition and site development.
This listing does not include downloadable attachments. The solicitation details may be in the description below.
Verify on SAM.govAmendment (0003) to correct Bid Opening Date.North Gunnison 115-kV Switch Installation to add a 115kV Disconnect Switch to the bus work to provide flexible operation to feed the North Gunnison loads and allow WAPA to maintain all the electrical substation equipment.a. Provide demolition and site development.b. Remove and dispose of existing pedestals, rigid bus, insulators, and concrete foundations.c. Furnish and install 115kV disconnect switch, structural steel, foundations, and associated equipment. Pratt, John W. Contracting . CROSSROADS BLVD (No Street Address
2) LOVELAND, CO 80538 USA
Get matched to contracts like this daily
Free AI-powered contract matching for your business.