Closed
Save

Construction Of Air Traffic Control Tower

Department of Defense (DoD) > U.S. Army > Engineer Division Great Lakes and Ohio River District LouisvilleSol: W912QR26RATCT
FFP
est. $15M – $35M

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of Defense is procuring the construction of an Air Traffic Control Tower at Fort Campbell, KY, through the U.S. Army Corps of Engineers. Key requirements include the design and construction of various facilities within the tower, adherence to antiterrorism standards, and comprehensive interior design and furnishings.

Generated 38d ago

Contract Details

Contract Typei
FFP
Estimated Value
est. $15M – $35M
Similar contracts award $25K to $402K (median $99K, 70,896 awards)Above typical range
NAICS Codes
Place of Performance
Fort Campbell, KY, USA

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
US Army Corps of Engineers
Office
Engineer Division Great Lakes and Ohio River District Louisville

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published1mo ago
Jun 16, 2026
Became Solicitation1mo ago
Jun 16, 2026
Tracked
Last Updated1mo ago
Jun 18, 2026
Response Date24d ago
Jul 1, 202615:00
Response Due23d ago
Jul 1, 2026

Description

The U.S.

Army Corps of Engineers (USACE) Louisville District intends to issue a Request for Proposal (Single Phase Evaluation Board – RFP) for the FCKY Air Traffic Control Tower (ATCT), located in Fort Campbell, KY.

Construct a standard Design Flight Control Tower.

The Primary Facility (Air Traffic/Flight Control Tower) includes spaces on the first floor and throughout the functional vertical shaft space for equipment maintenance, open and closed administrative offices, administrative support spaces, passenger elevator, a server room, storage, bathrooms with showers, locker rooms, training and conference rooms, a ready room, janitors’ closets, break room, control tower cab, Army Radar Approach Control functional space, mechanical, electrical and equipment rooms.

Project includes special foundations, backup power generation and an uninterruptable power supply.

Fire Life Safety (FLS) systems, Building Control Systems (BCS), and Electronic Security Systems (ESS) are included.

Get matched to contracts like this daily

Free AI-powered contract matching for your business.