The response deadline has passed. Review the details for future reference or to track similar opportunities.
The U.S. Army Corps of Engineers is procuring inspection, hydrostatic testing, recertification, repair, replacement, transportation, and refilling services for high-pressure carbon dioxide cylinders used in fire suppression systems at Albeni Falls Dam. The contractor will be responsible for all necessary labor, materials, and compliance with federal regulations. The contract is a Firm-Fixed-Price type with a performance period ending on August 31, 2026.
The contractor will provide comprehensive services for the inspection and maintenance of CO2 cylinders, ensuring they meet safety and operational standards.
Scope of Work CO2 Cylinder Inspection, Hydrostatic Testing, and Recertification Albeni Falls Dam | Seattle U.S. Army Corps of Engineers 1. General The purpose of this contract is to provide inspection, hydrostatic testing, recertification, repair, replacement, transportation, and refilling services for high-pressure carbon dioxide (CO2) cylinders utilized in the fire suppression systems at Albeni Falls Dam (AFD). The Contractor shall furnish all labor, supervision, materials, equipment, transportation, permits, and incidentals necessary to perform the services specified herein. 2. Description of Services The Contractor shall provide pickup, transportation, inspection, hydrostatic testing, recertification, repair, replacement, refilling, and return delivery of CO2 cylinders and associated valves in accordance with applicable federal regulations and industry standards. All cylinder inspections, testing, and recertification activities shall comply with the
requirements of Title 49, Code of Federal Regulations (CFR), Section 180.205, Requalification of Specification Cylinders, and all other applicable Department of Transportation (DOT) regulations. 3.
Contract Type Firm-Fixed-Price (FFP) with separately priced Contract Line-Item Numbers (CLINs) for repair and replacement actions, as approved by the Government. 4.
Background The CO2 cylinders covered under this contract provide fire suppression protection for electrical power generation equipment at Albeni Falls Dam. The fire suppression system consists of forty-eight (48) active 75-pound CO2 cylinders. A minimum reserve inventory of forty-eight (48) cylinders is maintained. An additional fourteen (14) cylinders may be available for inspection and evaluation. The total quantity of cylinders requiring service under this contract is estimated to be between forty-eight (48) and sixty-two (62) cylinders. 5.
Period of Performance The Contractor shall commence performance upon contract award and complete all work no later than
31 August 2026. 6.
Get matched to contracts like this daily
Free AI-powered contract matching for your business.