The response deadline has passed. Review the details for future reference or to track similar opportunities.
The Department of Defense is procuring INTERGARD 264,RED, a specific type of machinery manufacturing item. The contract requires that the item meet specified material and physical requirements, including marking and configuration control standards. Delivery is expected within 90 days, and the contractor must ensure compliance with government inspection requirements.
The contractor will manufacture INTERGARD 264,RED, ensuring compliance with military standards for marking and configuration control.
|4|N97113|FS|771-229-0460|[email protected]| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| STOP-WORK ORDER (AUG 1989)|1|| SPECIAL SHIPPING AND MARKING INSTRUCTIONS|6|x||x|||| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and Receiving Report (Combo)|Inspection / Acceptance Point: Source|TBD|N00104|TBD|TBD|SEE SCHEDULE|TBD|N/A|N/A|TBD|N/A|N/A|N/A|N/A|[email protected]| NOTE FOR CONTRACTOR/ADMINISTRATIVE
CONTRACTING OFFICER|3|||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL
REQUIREMENTS (NOV 2025))|1|| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (DEV 2026-O0037)(FEB 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| Confirmed that the requirement is for 1 Gallon, NOT % Gallon. No other changes are authroized. This is not an FMS Requirement/contract. Due to limitations, the FMSdesignation could not be removed. Contractor is liable for all shippingexpenses to DODAAC location(s) specified within Consignment Instruction notesin contract. NOTE: Thi is a shelf life item (5 UU). Please ensure your material can meet this requirement. GOVERNMENT SOURCE INSPECTION per FAR 52.246-2 IS REQUIRED. DELIVERY 90 DAYS. All contractual documents (i.e. contracts, purchase orders, task orders,delivery orders and modifications) related to the instant procurement areconsidered to be "issued" by the Government when copies are either depositedin the mail, transmitted by facsimile, or sent by other electronic commercemethods, such as email. The Government's acceptance of the contractor'sproposal constitutes bilateral agreement to "issue" contractual documents asdetailed herein. \ 1. SCOPE 1.1 This contract/purchase order contains the
requirements for manufacture of the INTERGARD 264,RED . 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3.
REQUIREMENTS 3.1 Manufacturing and Design - The INTERGARD 264,RED furnished under this contract/purchase order shall meet the material and physical
requirements as specified ; INTERGARD P/N: FPL274/FPA327 (INTERGARD 265, RED) CAGE CODE (26351) ^NOTE^ 1 GALLON KIT INCLUDES FPL274 = .8 GAL (3.2 QTS.) FPA327 = .2 GAL (.8 QTS.); . 3.2 Marking - Unless marking
Get matched to contracts like this daily
Free AI-powered contract matching for your business.