ActiveOpen for Bids
Save

Construction of Vehicle Recovery Range at Fort Lee

Department of Defense (DoD) > U.S. Army > Engineer Division North Atlantic District NorfolkSol: W9123626BA006
8(a)FFP
est. $450K – $1.2M
Quick Brief

The Department of Defense is procuring the construction of a vehicle recovery range at Fort Lee, which includes the installation of 24 concrete turning pads along with necessary site drainage improvements and road alignment. The project will be executed in three phases, with specific completion requirements for each phase, and will involve excavation and concrete placement according to design specifications.

Generated 5d ago

Can you win this contract?

Get your fit score, win probability, and required capabilities.

Fit Score7/10Consider

Scope & Requirements

The project involves constructing concrete turning pads and improving site drainage and road alignment at Fort Lee.

Contract Details

Contract Typei
FFP
Estimated Value
est. $450K – $1.2M
Similar contracts award $26K to $415K (median $100K, 70,869 awards)Above typical range
NAICS Codes
Place of Performance
Fort Lee
Set-Asides
8(a)

Qualifications & Eligibility

Set-Aside Category
SDVOSB

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
US Army Corps of Engineers
Office
Engineer Division North Atlantic District Norfolk

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published7d ago
Jul 17, 2026
Became Solicitation6d ago
Jul 17, 2026
Tracked
Last Updated4d ago
Jul 19, 2026
Response Duein 5d
Jul 28, 2026

Description

An amendment has been made to Solicitation W9123626BA0006. Please see attachment SF30, Solicitation Amendment W9123626BA006_0002, to view the site visit attendance log.. Project Summary: The purpose of this project is to construct 24 concrete turning pads, along with required site drainage improvements and road alignment and repair as necessary. The contract will be executed in three distinct phases, with the contractor granted access to only one phase at a time. Completion of each phase is required before proceeding to the next. The remaining phases (two and three) will only be performed if the options for phases are exercised. During construction activities in one phase, the Army will conduct training operations in the remaining two phases. Each turning pad, as identified in the project drawings, will require excavation of the existing roadbed and placement of concrete in accordance with the design specifications. Storm drainage systems will be installed to ensure positive site drainage throughout the construction process. Upon proper curing of the concrete turning pads, the connecting roads will be regarded and aligned to seamlessly integrate with the pads, as detailed in the contract drawings. Michael Stevenson Phone Number (757) 201-7233 Alternative

Point of Contact Michael Hagerty Phone Number (757) 201-7303

Get matched to contracts like this daily

Free AI-powered contract matching for your business.