Closed
Save

Intersection Safety Systems Prototyping

Dept. of Transportation > Federal Highway Administration
est. $250K – $1.2M

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of Transportation is procuring Intersection Safety Systems (ISS) prototyping to advance the development of cost-effective, real-time roadway safety systems. This initiative aims to address critical research questions regarding conflict prediction and mitigation at intersections and to evaluate the cost-benefit of broader ISS deployment. Proposals must be submitted via email to the contract specialist by the specified deadline.

Generated 7d ago

Scope & Requirements

The work involves prototyping Intersection Safety Systems to demonstrate their capabilities and address research questions related to traffic safety at intersections.

Contract Details

Estimated Value
est. $250K – $1.2M
Similar contracts award $119K to $1.1M (median $352K, 69,621 awards)Within typical range
NAICS Codes
Place of Performance
Washington, DC, USA

Agency & Contact

Contracting Organization

Agency
TRANSPORTATION, DEPARTMENT OF
Sub-Agency
Federal Highway Administration

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published9d ago
Jul 16, 2026
Last Updated9d ago
Jul 16, 2026
Became Solicitation8d ago
Jul 16, 2026
Tracked
Response Due4d ago
Jul 21, 2026

Description

SAM post updated on 07/16/2026 to reiterate how proposals must be submitted: PROPOSAL SUBMISSION: All proposals must be emailed directly to the contract specialist Jessica Prutz, at [email protected] by the date and time indicated in the Broad Agency Announcement section 2.1.

BACKGROUND: According to data from the National Highway Traffic Safety Administration (NHTSA), traffic crashes remain a major challenge, with 36,640 estimated U.S. fatalities in 2025 (NHTSA 2026). Pedestrians are especially at risk—a pedestrian died every 74 minutes, and a pedestrian was injured every 7 minutes in traffic crashes in 2024, on average (Traffic Safety Marketing by NHTSA). Intersections account for a significant proportion of these pedestrian fatalities, with about 18% of pedestrian fatalities having occurred at intersections in 2024 (Traffic Safety Marketing by NHTSA). In response to those concerns, and as part of the USDOT implementation of the National Roadway Safety Strategy (NRSS), the USDOT established the Intersection Safety Challenge or “the Challenge.” The Challenge was a two-stage prize competition aimed at developing new, cost-effective, real-time roadway Intersection Safety System (ISS) concepts, open to any capable and eligible entity. In the first stage of the Challenge, competitors were asked to develop concept papers describing their ISS, and the best concepts moved on to the next stage of the competition. In the second stage of the Challenge, which was open to first stage prize recipients, participating teams performed virtual testing of their ISS concepts utilizing Government-provided roadside sensor data and other supporting information. More information on the Challenge may be found at https://www.its.dot.gov/research-areas/intersection-safety/challenge, including the Challenge structure and awardees. The Challenge results indicated there is a compelling case that low-cost, infrastructure-based sensor systems, together with advanced algorithms to fuse data rapidly, show significant promise in achieving the overall vision of the Challenge. However, critical research

questions remain regarding the ability of any ISS to predict and mitigate conflicts in real-time. Conflict mitigation, in particular, which is a key element of the ISS vision, requires additional research and refinement. PURPOSE: The purpose of this BAA is to build on the success of the USDOT Intersection Safety Challenge by advancing end-to-end ISS prototyping by focusing on ISS prototype development to demonstrate the physical capabilities of ISS, address key research

questions regarding conflict prediction and mitigation at intersections, and consider the cost-benefit of broader ISS deployment. Note that while the Challenge was instrumental in assisting USDOT in understanding the maturity of the technologies and the risks and rewards associated with near-term ISS prototyping, this BAA is open to any eligible entity, regardless of prior Challenge participation or prizes won. Jessica Prutz Alternative

Point of Contact James Mikell Contracting , SE WASHINGTON, DC 20590 USA to this opportunity. Complete Q A_ISS Prototyping.xlsx 693JJ3-26-BAA-0004_ISS Prototyping.pdf Attachment 1 - Draft Performance Work Statement.docx Attachment 3 - Milestone Payment Schedule Template.xlsx

Get matched to contracts like this daily

Free AI-powered contract matching for your business.