The Department of Agriculture is procuring streambank stabilization services for the USDA-NRCS in Ohio County, West Virginia. Key requirements include clearing designated areas, controlling erosion, and preparing the site with various soil amendments, while ensuring safe public access and managing water during construction activities.
Get your fit score, win probability, and required capabilities.
The project involves streambank stabilization through various construction activities including clearing, erosion control, and site preparation.
Please see Attachment 1 Specifications documents for full details of services requried. USDA-NRCS West Virginia - Ohio County EWP 5090-001 & 003 Streambank Stabilization Dixon and McGraw's Run A site visit will be held on date May 27th, 2026 at 10:00am ET on that day. Attendees will meet at: Valley Grove Community Center 8566 National Road Valley Grove, WV 26060 The project consists of clearing designated areas by the removal and disposal of trees, logs, stumps, shrubs, brush, and rubbish and the shaping of the channel. Installing measures or performing work to control erosion and minimize the production of sediment and other pollutants to water and air from construction activities. Preparing the area for treatment; furnishing and placing seed, sprigs, mulch, fertilizer, inoculant, lime, and other soil amendments; and anchoring mulch in designated areas as specified. The work consists of the mobilization and demobilization of the contractor’s forces and equipment necessary for performing the work required under the contract. Establishing traffic control and maintaining safe, convenient use of public roads and right of way. Removal of surface water and ground water as necessary to perform the construction required by the contract in accordance with the specifications. It must include: (1) constructing, installing, building, and maintaining all necessary temporary water containment facilities, channels, and diversions; (2) furnishing, installing, and operating all necessary pumps, piping, and other facilities and equipment; and (3) removing all such temporary works and equipment after their intended function is no longer required. Excavation required by the drawings and specifications, as well as the disposal of the excavated materials. Construction of earth embankments, other earthfills, and earth backfills required by the drawings and specifications. See Specifications document attached to posting for full details of required work. Mark Domingo Contracting -ACQ DIV 1400 INDEPENDENCE AVE SW WASHINGTON, DC 20250 USA to this opportunity. Attachment 3 WD WV20250073 1-2-2026.pdf Attachment 2 Drawings Dixon and McGraw Run.pdf Attachment 1 Dixon and McGraw Run Specs.pdf
Get matched to contracts like this daily
Free AI-powered contract matching for your business.