ActiveOpen for Bids
Save

Streambank Stabilization for Dixon and McGraw's Run

USDA > Farm Production & Conservation Business Center > ACQ DIVSol: 12FPC326B0011
SB
est. $100K – $500K
Quick Brief

The Department of Agriculture is procuring streambank stabilization services for the USDA-NRCS in Ohio County, West Virginia. Key requirements include clearing designated areas, controlling erosion, and preparing the site with various soil amendments, while ensuring safe public access and managing water during construction activities.

Generated 16d ago

Can you win this contract?

Get your fit score, win probability, and required capabilities.

Fit Score7/10Consider

Scope & Requirements

The project involves streambank stabilization through various construction activities including clearing, erosion control, and site preparation.

Contract Details

Estimated Value
est. $100K – $500K
Similar contracts award $44K$1.1M (median $203K, 8,719 awards)Within typical range
NAICS Codes
Place of Performance
Valley Grove, WV, USA
Set-Asides
SB

Qualifications & Eligibility

Set-Aside Category
Total Small Business

Agency & Contact

Contracting Organization

Agency
AGRICULTURE, DEPARTMENT OF
Sub-Agency
FARM PRODUCTION AND CONSERVATION BUSINESS CENTER
Office
ACQ DIV

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published17d ago
May 18, 2026
Became Solicitation16d ago
May 19, 2026
Tracked
Last Updated16d ago
May 19, 2026
Site Visit8d ago
May 27, 202610:00
Mandatory
Response Duein 14d
Jun 18, 2026

Description

Please see Attachment 1 Specifications documents for full details of services requried. USDA-NRCS West Virginia - Ohio County EWP 5090-001 & 003 Streambank Stabilization Dixon and McGraw's Run A site visit will be held on date May 27th, 2026 at 10:00am ET on that day. Attendees will meet at: Valley Grove Community Center 8566 National Road Valley Grove, WV 26060 The project consists of clearing designated areas by the removal and disposal of trees, logs, stumps, shrubs, brush, and rubbish and the shaping of the channel. Installing measures or performing work to control erosion and minimize the production of sediment and other pollutants to water and air from construction activities. Preparing the area for treatment; furnishing and placing seed, sprigs, mulch, fertilizer, inoculant, lime, and other soil amendments; and anchoring mulch in designated areas as specified. The work consists of the mobilization and demobilization of the contractor’s forces and equipment necessary for performing the work required under the contract. Establishing traffic control and maintaining safe, convenient use of public roads and right of way. Removal of surface water and ground water as necessary to perform the construction required by the contract in accordance with the specifications. It must include: (1) constructing, installing, building, and maintaining all necessary temporary water containment facilities, channels, and diversions; (2) furnishing, installing, and operating all necessary pumps, piping, and other facilities and equipment; and (3) removing all such temporary works and equipment after their intended function is no longer required. Excavation required by the drawings and specifications, as well as the disposal of the excavated materials. Construction of earth embankments, other earthfills, and earth backfills required by the drawings and specifications. See Specifications document attached to posting for full details of required work. Mark Domingo Contracting -ACQ DIV 1400 INDEPENDENCE AVE SW WASHINGTON, DC 20250 USA to this opportunity. Attachment 3 WD WV20250073 1-2-2026.pdf Attachment 2 Drawings Dixon and McGraw Run.pdf Attachment 1 Dixon and McGraw Run Specs.pdf

Get matched to contracts like this daily

Free AI-powered contract matching for your business.