The response deadline has passed. Review the details for future reference or to track similar opportunities.
The Department of the Air Force is seeking sources for a turnkey, managed high-speed Wi-Fi solution for the Buckley Fitness Center, which requires a 1 Gbps fiber optic internet circuit and associated hardware. The solution must support over 1,500 simultaneous users and include installation, ongoing support, and a warranty.
The contractor will provide a complete 1 Gbps Managed Wi-Fi System, including hardware, software, engineering, and installation services, along with ongoing support and warranty.
This listing does not include downloadable attachments. The solicitation details may be in the description below.
Verify on SAM.govA site visit to the Buckley Fitness Center (for the Wi-Fi project) is being offered to interested parties on Wednesday, February 25, at 10:30am MST. If you are planning to attend, please send an email to [email protected] with name/company of the attendee(s) for escort onto the base. Attendees will go to the Visitor Center, 1140 Aspen Street, Aurora, Colorado, 80017 to get a visitor pass. please arrive no later than 10:15am on February 25. Access to Buckley Space Force Base requires Real- identification OR a current and valid US Passport. If you do not have either, you will not be able to enter the base. ---------------------------------------------------------------------- Sources Sought Notice: Managed Wi-Fi Solution Reference Number: FA2543FitnessCenterWi-Fi Agency: Department of the Air Force, Buckley Space Force Base, Colorado Disclaimer:
This is a Sources Sought Notice for market research purposes only and does not constitute a solicitation for proposals or a commitment to award a contract. The Government will not reimburse any costs associated with providing a response to this notice. 1. Introduction The 460th Force Support Squadron at Buckley Space Force Base (SFB), located in the Denver-metro area, is seeking sources capable of providing a turnkey, managed high-speed Wi-Fi solution for the base fitness center. The facility is approximately 80,000 sq. ft., constructed with a steel frame and concrete floors. The desired solution must support a high-density environment of over 1,500 simultaneous users. 2. Summary of
Requirements The Government requires a comprehensive solution that includes a 1 Gbps fiber optic internet circuit and all associated hardware, installation, and ongoing support. Category Key Requirement Internet Service 1 Gbps symmetrical (1000 Mbps download/upload) dedicated fiber optic circuit. Core Hardware Enterprise-grade firewall, 24-Port Managed PoE Switch, and high-density Wi-Fi 6/6E Access Points. Service Model Monthly subscription basis, including all hardware, licensing, and support to eliminate upfront capital costs. Support & Warranty 24/7/365 proactive network monitoring and a "no-fault" warranty covering repair or replacement of all hardware. Project Completion The system must be fully installed, tested, and operational no later than March 29, 2026. 3.
Scope of Work & Services The contractor shall provide all necessary hardware, software, engineering, and installation services for a complete 1 Gbps Managed Wi-Fi System. Core Service Features (Monthly Subscription): Turnkey Solution: Provide, manage, and maintain all components required for the service. Professional Installation: Includes a predictive site survey, network design to ensure optimal coverage, and professional installation of all cabling and hardware. Hardware Provision: All necessary equipment, including a firewall/controller, 24-port PoE+ switch, and Wi-Fi Access Points, provided on a subscription basis. Total Warranty & Replacement: All equipment is fully covered against failure, damage, or obsolescence for the duration of the contract term. License Management: Contractor is responsible for managing all required software and service licenses. Installation Tasks: The contractor shall perform all tasks required for a successful installation, including but not limited to: General site and Wi-Fi predictive surveys. Determination of network demarcation point. Placement and installation of router, switches, and Wi-Fi Access Points. Installation of all interconnecting wiring. Verification of adequate power sources. Final system turn-up, testing, and user training. General
Requirements: The contractor is responsible for providing all tools and equipment necessary for installation (e.g., scissor lifts, ladders, cabling tools). 4. Response Submission Instructions Interested parties are requested to submit a capability statement in response to this notice. Submissions should be sent via email to [email protected], with the subject line "Response to: FA2543FitnessCenterWi-Fi". Response Due Date: No later than 4:00 PM MST on February 25, 2026. Your capability statement should include: Company Information: Company name, address,
point of contact, phone number, email address, CAGE code, and UEI number. Business Size: Please indicate your business size status (e.g., Small Business, 8(a), HUBZone, SDVOSB, etc.). Statement of Capability: A brief description of your company's ability to meet the
Get matched to contracts like this daily
Free AI-powered contract matching for your business.