Closed
Save

Propulsion System Rocket Engine Transport Trailer 2

Department of Defense (DoD)
8(a)HUBZoneSDVOSBWOSBTBD
est. $37K – $350K

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of Defense is seeking to evaluate potential contractors for the Propulsion System Rocket Engine Transport Trailer 2 program, which involves developing a replacement trailer for transporting PSREs. The new design must meet specific requirements for protection, transportation, and environmental control of the PSREs, addressing challenges such as parts obsolescence and the need for engineering updates. The procurement will involve acquiring five trailers, with some to be procured during the Engineering, Manufacturing, and Development phase.

Generated 30d ago

Contract Details

Contract Type
TBD
Estimated Value
est. $37K – $350K
Similar contracts award $12K$111K (median $39K, 2,983 awards)Above typical range
Expected Awards
5
NAICS Codes
Set-Asides
8(a), HUBZone, SDVOSB, WOSB

Qualifications & Eligibility

NAICS Size Standard
1000 employees

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published3mo ago
Mar 9, 2026
Last Updated3mo ago
Mar 9, 2026
Became Sources Sought3mo ago
Mar 9, 2026
Tracked
RFI Round #3 Opening3mo ago
Mar 9, 2026
Response Due3mo ago
Mar 18, 2026
Response Date2mo ago
Mar 24, 202616:30
MDT

Description

------- ATTENTION // OPENING UP FOR ROUND #3 OF RFI in BOLD below // RESPONSE REQUESTED. --------- 3/9/2026 AGENCY/ORGANIZATION: Department of the Air Force, Air Force Materiel Command, AFNWC/NIMT WEAPON SYSTEM: Minuteman III (MMIII) Intercontinental Ballistic Missile (ICBM) IPT: Ground Mechanical RFI PURPOSE: This RFI provides notice that the PTT2 program team is currently evaluating the availability and manufacturability of a form, fit, and function replacement. The form, fit, function PTT2 replacement must meet the

requirements in Attachment 1. PTT2 System

Requirements Document. NOTICE: This notification is for market research purposes only to identify potential contractors who have the skills, experience, and knowledge required to successfully complete this effort for the PTT2 effort and is not to be construed as a solicitation. The issuance of this RFI and responses thereto do not imply a commitment to release a solicitation. A determination by the Government not to compete any or all portions of the work discussed in this RFI rests solely within the discretion of the Government. The Government will not pay for time, effort, materials, or any other costs that arise as a consequence of responding or providing information related to this RFI. The purpose of this Sources Sought Synopsis is to conduct market research to determine if responsible sources exist and if this effort can be competitive and/or a total Small Business Set-Aside. The proposed North American Industry Systems (NAICS) Code is intended to be 336212 or 336999 which have a corresponding size standard of 1,000 or fewer employees. The Government will use this information to determine the best acquisition strategy for this procurement. The Government is interested in all small business, to include 8(a), Service-Disabled Veteran-Owned, historically underutilized business zone (Hubzone), and Women-Owned small business concerns.

BACKGROUND: The Air Force’s (AF) fleet of PTT must support the MMIII LGM-30G ICBM until the end of its operational life. However, the existing challenge of parts obsolescence poses a significant obstacle to providing seamless support. Additionally, a scarcity of spare parts, some entirely unobtainable, coupled with substantial engineering updates required by the Technical Data Package (TDP), further complicates the situation. Given these considerations, the AF aims to develop a new design, create a new TDP, and ultimately increase the PTT fleet. Procurement of five PTT2, including one to two PTT2 during the Engineering, Manufacturing, and Development (EMD) phase, will be required. During Production, the AF expects to procure the remaining three or four PTT2s for a total of five. PTT DESCRIPTION: The PTT is a trailer that provides protection and transportation of PSREs housed within a PSRE Shipping Container. The PTT is used to transport the PSRE(s) to various storage and operational locations. The PTT provides a transportation platform that limits excessive shock and vibration to the PSRE assembly. It also provides a temperature-controlled environment designed to keep the PSRE within its required temperature range during transportation. The Environmental Control Unit provides the required temperature control by use of an on-board diesel fueled generator and a closed loop Heating, Ventilation, and Air Conditioning unit. ///////////////////////// ROUND #3 RFI /////////////////////// INFORMATION SOUGHT: Provide a detailed overview of your company's sub-contractor management plan. This plan should address, at a minimum, your procedures for: Requirement Compliance: How do you ensure sub-contractors adhere to all contractual and project-specific

requirements? Performance Management: What metrics and processes do you use to monitor and evaluate sub-contractor performance in meeting cost, schedule, and technical

requirements? Specialized Processes: How do you oversee and ensure the quality of specialized work, such as welding, performed by sub-contractors? Integration: How do you plan to ensure comprehension of technical

Get matched to contracts like this daily

Free AI-powered contract matching for your business.