The response deadline has passed. Review the details for future reference or to track similar opportunities.
The Department of Veterans Affairs is contracting for site security renovations at the Cincinnati VAMC, including demolition and installation of security systems across the main hospital, CLC, utility plant, administrative buildings, and parking garage, requiring construction, electrical, telecommunications, and site work to be performed in accordance with detailed drawings and specifications, with some tasks scheduled outside normal business hours due to utility shutdowns.
The contractor shall provide all tools, equipment, materials, permits, labor, and supervision to perform construction work for site security renovations at the Cincinnati VAMC, including demolition and installation of security systems across multiple facilities, in compliance with project drawings and specifications, with work requiring coordination around utility shutdowns and non-standard hours.
The Contractor shall provide all tools, equipment, material, permits, labor, and supervision required to completely perform the required construction work for the subject project. All work shall be completed in accordance with the project drawings and specifications. The
scope of work involves renovation for site security in the main hospital, CLC, Utility Plant, Admin bldg. 3, parking garage and the VA Cincinnati Site. Work includes, but is not limited to, general construction, alterations, electrical, telecommunications, and site work, necessary for demolition and removal of security gate, card readers, fencing, walls, ceilings, piping and certain other items necessary for completion and installation of new work. Due to the utility/roadway shutdowns required, some of this work will have to be scheduled outside of normal facility business hours. A full list of
requirements and further details are provided in the project drawings and specifications. The above construction Statement of Work constitutes a basic outline of work and in no way outlines all details for the construction of this project. It is recommended that a detailed inspection of the premises, drawings and specifications be initiated to determine the needs and conditions for the construction of this project. Amd 0001 - Site Visit Sign In Log Amd 0002 - RFI Responses and ICRA Permit Brian Rosciszewski to this opportunity. 36C25026B0032 0002.pdf Attach 2.1 - RFI Responses.pdf Attach 2.2 - ICRA Permit.pdf 36C25026B0032 0001.pdf Attach 1.1 - Site Visit Sign In Log.pdf 36C25026B0032_1.pdf Attach I - Wage Determination 1.2.2026.txt Attach II - Site Security Specifications 2.23.26.pdf Attach III - Site Security Drawings 2.23.26.pdf Attach IV - VAAR 852.219-75 VA NOTICE OF LIMITS ON SUBCONTRACTING_CERT OF COMPLIANCE JAN 2023 DEV.doc.docx
Get matched to contracts like this daily
Free AI-powered contract matching for your business.