The response deadline has passed. Review the details for future reference or to track similar opportunities.
The procurement involves the replacement and repair of dam valve assemblies for three earthen dams located in the Hoosier National Forest, specifically at Celina Lake, Saddle Lake, and U-38 dam. The work includes replacing valve assemblies at two dams and repairing one, with detailed specifications and diagrams provided in the attachments.
The work includes the replacement of valve assemblies at Celina Lake and Saddle Lake dams, and the repair of the valve assembly at the U-38 dam.
The Hoosier National Forest has three earthen dams that have maintenance needs with their valve operations. These dams are located on the Tell City Ranger District (See attached maps for locations and directions). The existing valve systems for all three dams are different. Known equipment and diagrams for each dam have been included in
attachments to this solicitation. A copy of the as-builts can be acquired upon request. The
scope of work includes the replacement of the dam valve assemblies at Celina Lake and Saddle Lake dams, and the repair of the dam valve assembly at the U-38 dam located on the Hoosier National Forest Jordan Wheelock Contracting (No Street Address
2) Atlanta, GA 303092449 USA to this opportunity.
Questions and Answers 2.pdf
Questions and Answers.pdf RFQ 12444526Q0013.pdf Attachment D SaddleValve And StemAsBuilt.pdf Attachment G Wage Determination.pdf Attachment B CelinaValveInformation.pdf Attachment E Statement of Work.pdf Attachment F U38ValveInformation.pdf Attachment A CelinaSaddleU38Specifications.pdf
Get matched to contracts like this daily
Free AI-powered contract matching for your business.