Closed
Save

Cyber National Mission Force Mission Operations Facility Construction

Department of Defense (DoD) > U.S. Army > Engineer Division North AtlanticSol: W912DR26RA010
FFP
est. $450M – $750M

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of the Army is procuring the design and construction of a state-of-the-art Mission Operations Facility for the Cyber National Mission Force at Ft. Meade, Maryland. The project includes a 750,000 gross square foot building for 2,400 personnel, an expansion of a multi-level parking structure, and various site improvements including a pedestrian bridge and utility installations.

Generated 29d ago

Scope & Requirements

Design and construction of a 750,000 GSF mission facility, parking structure expansion, and associated site infrastructure including a pedestrian bridge and utility upgrades.

Deliverables

  • Mission Operations Facility (CNMF-MOF)
  • Expansion of East Campus Parking Structure 4 (ECPS 4)
  • Pedestrian bridge connecting CNMF-MOF to ECB 5
  • Storm water management facilities
  • Roadway improvements

Contract Details

Contract Typei
FFP
Estimated Value
est. $450M – $750M
Similar contracts award $25K to $402K (median $99K, 70,896 awards)Above typical range
NAICS Codes
Place of Performance
Ft. Meade, Maryland, USA

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
US Army Corps of Engineers
Office
Engineer Division North Atlantic

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published1mo ago
Jun 24, 2026
Became Solicitation1mo ago
Jun 24, 2026
Tracked
Last Updated29d ago
Jun 26, 2026
Response Due25d ago
Jun 29, 2026

Description

The Cyber National Mission Force - Mission Operations Facility (CNMF-MOF) project

requirements focus on the design and construction of a State-of-the-Art Mission building within the Central Campus site at Ft. Meade, Maryland. The primary facility is approximately 750,000 gross square feet (GSF) in size and will accommodate approximately 2,400 people. The state-of-the-art facility shall allow for a variety of tenant occupancy functions and flexible size and configurations to conduct the mission, administrative, and support services. The project also includes the expansion of the multi-level East Campus Parking Structure 4 (ECPS

4) for 1,758 spaces of structured parking. The overall CNMF-MOF parking requirement is 85% of the MOF projected seat count and may be accommodated through the expansion of ECPS 4 and surface parking. All required utilities, connections, and secure telecommunication distribution systems shall be fully integrated into the facilities. The project also includes but is not limited to a pedestrian bridge connecting the CNMF-MOF to the East Campus Building 5 (ECB 5); relocation of the Construction Surveillance Technician (CST) trailers; on-site/off-site roadway improvements; storm water management facilities; site restorations, reforestation; existing on-site utilities improvements; installation of new utilities; demolition of an existing building; and life safety generation. Erica Eaton Alternative

Point of Contact Paula Beck Phone Number (410) 962-0874

Get matched to contracts like this daily

Free AI-powered contract matching for your business.