ActiveOpen for Bids
Save

Replacement and Installation of Emergency Exit Signs and Lighting

State DepartmentSol: PR16062817
FFP
est. $13K – $136K
Quick Brief

The U.S. Department of State is procuring the replacement and installation of emergency exit signs and emergency egress lighting at the U.S. Consulate General in Frankfurt, Germany. The contractor will be responsible for providing all necessary materials, labor, and equipment to ensure a code-compliant installation, including site surveys, removal of existing fixtures, and comprehensive testing and documentation. Compliance with both U.S. and German regulations is required, along with relevant experience in high-security facilities.

Generated 16d ago

Can you win this contract?

Get your fit score, win probability, and required capabilities.

Fit Score7/10Consider

Scope & Requirements

The contractor will replace and install emergency exit signs and egress lighting systems at multiple Consulate facilities, ensuring compliance with applicable codes and standards.

Deliverables

  • as-built drawings
  • test reports
  • circuit schedules
  • product data sheets
  • warranties
  • maintenance manuals
  • updated asset inventory

Contract Details

Contract Typei
FFP
Estimated Value
est. $13K – $136K
Similar contracts award $13K to $139K (median $39K, 9,267 awards)Within typical range
NAICS Codes
Place of Performance
Frankfurt, Germany

Qualifications & Eligibility

Past Performance
demonstrate relevant experience in government, diplomatic, institutional, or high-security facilities

Agency & Contact

Contracting Organization

Agency
STATE, DEPARTMENT OF

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published18d ago
Jul 7, 2026
Became Solicitation17d ago
Jul 7, 2026
Tracked
Last Updated15d ago
Jul 9, 2026
Response Duein 16d
Aug 9, 2026

Description

The U.S. Consulate General Frankfurt has a requirement to Replacement and Installation of Exit Signs and Emergency Egress Lighting A. located at the Joachim-Becher-Straße 19 and AmConGen Frankfurt, Gießener Straße 30. The Contractor shall furnish all materials, equipment, and labor required to complete the work. The proposed

scope of work includes, but is not limited to, the following: 1. Replacement and Installation of Exit Signs and Emergency Egress Lighting The project consists of the replacement, installation, testing, commissioning, and documentation of emergency exit signs and emergency egress lighting systems throughout multiple Consulate facilities. The Contractor shall provide all labor, materials, equipment, supervision, transportation, and services necessary to deliver a complete, fully operational, and codecompliant installation. The scope includes a detailed site survey, assessment and documentation of existing conditions, removal and disposal of existing fixtures, installation of new LED exit signs and emergency luminaires, electrical modifications, firestopping of penetrations, system testing, commissioning, labeling, and final cleanup. All work shall comply with applicable U.S. codes and standards, including NEC (NFPA 70), NFPA 101, NFPA 72, OSHA

requirements, UL 924, the International Building Code (IBC), and local Authority Having Jurisdiction (AHJ)

requirements. As the project is located in Germany, the Contractor shall also ensure compliance with all applicable German and European regulations and standards, including, where applicable, DIN EN 1838 (Emergency Lighting), DIN EN 50172 / VDE 0108-100 (Emergency Escape Lighting Systems), DIN VDE electrical installation standards, the German Workplace Ordinance (ArbStättV), Technical Rules for Workplaces (ASR A2.3 Escape Routes and Emergency Exits), local building regulations, and fire protection

requirements. The Contractor shall perform functional testing, emergency operation verification, illumination measurements, and compliance checks to ensure that all installed systems meet life-safety and emergency egress

requirements. Upon completion, comprehensive closeout documentation shall be provided, including as-built drawings, test reports, circuit schedules, product data sheets, warranties, maintenance manuals, and an updated asset inventory. Due to the work being performed within an active Consulate facility, strict security and access procedures shall apply. The Contractor must demonstrate relevant experience in government, diplomatic, institutional, or high-security facilities, employ qualified and licensed personnel, and coordinate all activities with facility management and security representatives. Final acceptance will be subject to successful completion of all work, testing, documentation, correction of deficiencies, and written approval by the

Get matched to contracts like this daily

Free AI-powered contract matching for your business.