ActiveOpen for Bids
Save

Coos Bay Fuel System Upgrades

Department of Defense (DoD) > U.S. Army > Portland DistrictSol: W9127N26QA118
SBFFP
est. $85K – $210K
Quick Brief

The Department of Defense is procuring upgrades to fuel supply facilities at Coos Bay, Oregon, specifically involving the removal and replacement of existing oil piping and an oil tank. Key requirements include the replacement of approximately 275 feet of bilge oil piping and a 550-gallon used oil tank, with work scheduled to occur from October 1, 2026, to March 30, 2027.

Generated 2d ago

Can you win this contract?

Get your fit score, win probability, and required capabilities.

Fit Score7/10Consider

Scope & Requirements

The work involves removing and replacing existing oil piping and an oil tank, including certified testing post installation.

Contract Details

Contract Typei
FFP
Estimated Value
est. $85K – $210K
Similar contracts award $25K to $681K (median $106K, 1,013 awards)Within typical range
Period of Performance
2026-10-01 to 2027-03-30
NAICS Codes
Place of Performance
Coos Bay, OR, USA
Set-Asides
SB

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
U.S. Army Corps of Engineers
Office
Portland District

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published4d ago
Jul 20, 2026
Became Solicitation3d ago
Jul 20, 2026
Tracked
Last Updated2d ago
Jul 21, 2026
Response Duein 13d
Aug 5, 2026

Description

Update: Amendment 0001 is to revise RFO provision 52.212-1 "Instructions to Offerors" from IBR to Full Text. Request for Quotes: W9127N26QA118 U.S. Army Corps of Engineers (USACE) – Portland District is requesting quotes from qualified vendors with the capability and availability to remove and replace existing oil piping and an oil tank located in Coos Bay, OR. The work includes removing and replacing approximately 275’ of bilge oil piping, connections, valves, couplings, elbows, and pipe supports, replacement of a 550 gallon used oil tank, re-using the concrete pad and elevating the new tank 1 foot, and replacing approximately 300’ of separate used oil piping, connections, valves, couplings, elbows, and pipe supports, as well as certified testing post installation. Work will be conducted from approximately

01 October 2026 –

30 March 2027. Please reference the attached documents. Julia Carlton Alternative

Point of Contact Brandon Lasich to this opportunity. Solicitation Amendment W9127N26QA1180001 SF 30.pdf Wage Determ SCA 2015-5579 Rev28.pdf Attachment D Reference Photos.pdf Attachment C Trailer Footprint.pdf Attachment B Original Manufacturer Model Drawings.pdf Attachment A Site Location.pdf PWS Coos Bay Fuel Upgrades.pdf

Get matched to contracts like this daily

Free AI-powered contract matching for your business.