The response deadline has passed. Review the details for future reference or to track similar opportunities.
The Department of Health and Human Services is procuring construction services for the Collin Haupt (Makah) Water Pressure System (WPS) and Onsite Sewage System (OSS). This opportunity is set aside for small businesses and requires compliance with specific technical provisions and designs.
The work involves the construction of a water pressure system and an onsite sewage system for the Collin Haupt project.
Collin Haupt (Makah) WPS and OSS Robert S. Miller Alternative
E. Hart Contracting -24 SEATTLE, WA 98121 USA to this opportunity. 8-US DOL WD WA20260081 Dated 1-2-2026.pdf 7-Measurement and Payment.docx 6-Well Log.pdf 5-County Approved Septic Design.pdf 4-Water Pressure System Design.pdf 2-Aerial View.pdf 1-Statement of Work (Revised).docx B01 75H70126Q00018.pdf
Get matched to contracts like this daily
Free AI-powered contract matching for your business.