Closed
Save

Replace Roof at San Luis Obispo Air Traffic Control Tower

Dept. of Transportation > FAA > FAA SW REGIONALSol: 00SBP
SBFFP
est. $85K – $150K

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Federal Aviation Administration is procuring roof replacement services for the Air Traffic Control Tower at San Luis Obispo Airport, including removal and disposal of the existing roofing system, installation of a new roof hatch with guardrail kit, replacement of roof drains and hatch, and relocation of grounding counterpoise to the parapet wall, with all debris removal to comply with local and state regulations.

Generated 22d ago

Scope & Requirements

The subcontractor shall furnish all labor, materials, equipment, supervision, and services to replace the roof on the ATCT cab at SBP, including removal and disposal of existing roofing, installation of a new roof hatch with guardrail kit, replacement of roof drains and hatch, and relocation of grounding counterpoise to the parapet wall, with daily debris removal per local and state requirements.

Deliverables

  • New roof system installed on ATCT cab
  • Roof hatch guardrail kit with self-closing gate (galvanized finish)
  • Replacement roof drains
  • Replacement roof hatch
  • Relocated grounding counterpoise on parapet wall
  • Debris and trash removed and disposed of per local and state regulations

Contract Details

Contract Typei
FFP
Estimated Value
est. $85K – $150K
Similar contracts award $26K$370K (median $93K, 3,178 awards)Within typical range
Incumbent Contractor
Rodgers Cox Contracting
NAICS Codes
Place of Performance
San Luis Obispo, CA, US
Set-Asides
SB

Qualifications & Eligibility

Past Performance
Past Performance Questionnaire required (Attachment 4)
Required Registrations
  • SAM.gov

Agency & Contact

Contracting Organization

Agency
TRANSPORTATION, DEPARTMENT OF
Sub-Agency
FEDERAL AVIATION ADMINISTRATION
Office
FAA SW REGIONAL

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Opportunity posted2mo ago
Apr 2, 2026
Published28d ago
May 7, 2026
Became Sources Sought28d ago
May 7, 2026
Tracked
Last Updated26d ago
May 9, 2026
Response Due16d ago
May 19, 2026

Description

The Subcontractor shall furnish all labor, materials, equipment, supervision and all other services required to replace the roof at ATCT at SBP. Attached drawings are for reference only, Approximate quantities ATCT Cab roof 361 sq. ft. The

scope of work includes but not limited to: • Remove and dispose of existing roofing system from the SBP ATCT cab roof. • Provide and install roof hatch guardrail kit with self closing gate, galvanized finish. to meet code compliance. • Remove and replace all roof drains. • Remove and replace roof hatch • Remove and relocate grounding counterpoise from roof to parapet wall. • Remove debris and trash generated from work and dispose of the debris per local and state

requirements, daily. Rodgers Cox Contracting -500, FAA SW REGIONAL , TX 76177 USA to this opportunity. 697DCK-26-R-00208 - Amendment 3.pdf 697DCK-26-R-00208 - Amendment 2.pdf 697DCK-26-R-00208 - Amendment 1.pdf 697DCK-26-R-00208 - FE.pdf Attachment 1 - SBP ATCT Roof Replacement SOW.V2.pdf Attachment 1 - SBP ATCT Roof Replacement SOW.pdf Attachment 2 - DB Act WD CA20260012 - San Luis Obispo County.txt Attachment 4 - Past Performance Questionairre.pdf

Get matched to contracts like this daily

Free AI-powered contract matching for your business.