Replace Underground Jet Fuel Storage Tank at Building 175, NAS Lemoore

Department of Defense (DoD) > U.S. Navy > NAVFAC PACIFIC
$2.6M

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of Defense is procuring the replacement of an underground jet fuel storage tank with a new above-ground tank at Building 175, NAS Lemoore, CA. The project includes installation of a new 20,000-gallon double-wall tank, associated infrastructure, and demolition of the existing underground tank.

Generated 57d ago

Scope & Requirements

Replace the underground jet fuel storage tank at Building 175, NAS Lemoore, CA with a new 20,000-gallon double-wall above-ground tank, including installation of new infrastructure and demolition of the existing tank.

Deliverables

  • Install new concrete pad, tank footings, and containment curb
  • Install new 20,000 gallon double-wall above-ground jet fuel storage tank
  • Install new concrete fuel pipe trench with traffic rated grating
  • Install new electrical pull boxes, concrete ductbank, and conduits
  • Install new fuel pumps
  • Relocate devices and piping, including new cathodic protection
  • Relocate existing emergency stop panel and add new readout
  • Install new stainless steel piping and valves
  • Install bollards around the new tank and pad area
  • Install new light post and switch
  • Install new fire hydrant
  • Install new eyewash station
  • Perform equipment testing and verifications
  • Demolish and remove existing concrete and tank
  • Remove existing devices and piping
  • Excavate and remove the 20,000 gallon underground jet fuel storage tank
  • Remove concrete base beneath the existing underground tank
  • Perform clean-up and testing
  • Remove existing fire hydrant and associated piping
  • Remove existing valve, valve box, pedestal type hose bib, and associated piping
  • Remove existing bollards
  • Remove existing concrete ductbank and conduits
  • Remove existing double wall fuel supply and return pipes

Attachments

No files on SAM.gov

This listing does not include downloadable attachments. The solicitation details may be in the description below.

Verify on SAM.gov

Contract Details

Contract Value
$2.6M
Similar contracts award $25K – $400K (median $99K, 73,582 awards)Above typical range
NAICS Codes
Place of Performance
Lemoore, CA, USA

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
DEPT OF THE NAVY
Office
NAVFAC PACIFIC

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Tank Removal Deadline5mo ago
Dec 31, 2025
Mandatory
Became Presolicitation4mo ago
Feb 3, 2026
Tracked
Response Due2mo ago
Apr 3, 2026

Description

The intent of this project is to replace the underground jet fuel storage tank at the B-175 Jet Engine Test Cell with a new, double-wall, aboveground storage tank. Specific methods shall be as described below. Work

Requirements: a. Construction: 1. Install new concrete pad, tank footings, and containment curb in accordance with the drawing

requirements including piping and conduit penetrations. 2. Install a new 20,000 gallon factory fabricated, double wall, protected, above-ground jet fuel storage tank including platform and stairway as indicated on the drawing. 3. Install new concrete fuel pipe trench with traffic rated grating as indicated on the drawing. 4. Install new electrical pull boxes, concrete ductbank, and conduits as indicated on the drawing. 5. Install new two new fuel pumps in accordance with the pump schedule. 6. Relocate indicated devices and piping including new cathodic protection for underground piping. 7. Relocate existing emergency stop panel as indicated and add a new readout for the automatic tank gauge system. 8. Install new stainless steel piping and valves as indicated to re-establish all connections with the new above-ground tank. 9. Install bollards all the way around the new tank and pad area as indicated on the drawing. 10. Install new light post where indicated on the drawing, including switch near the stairwell. 11. Install new fire hydrant where indicated on the drawing. 12. Install a new eyewash station as indicated. 13. Perform all requisite equipment testing and verifications in accordance with specification

requirements. b. Demolition: 1. Demolish and remove all concrete as indicated above the underground tank to provide access for excavation of the tank. 2. Remove existing devices and piping to be relocated as indicated on the drawing. 3. Remove existing emergency stop panel and associated conduit to be relocated as indicated on the drawing. 4. Remove existing cathodic protection test wells and associated cabling and anodes where indicated. 5. Remove existing fiberglass transition sump and concrete collar as indicated. 6. Remove the existing fuel pumps, associated devices, and electrical boxes and conduits as indicated. 7. Excavate and completely remove the 20,000 gallon underground jet fuel storage tank. This tank removal must be completed (out of the ground) by December 31st 2025. Liquidated damages may be assessed as detailed in Section 1.7 for this activity. 8. Remove the concrete base beneath the existing underground tank. 9. Perform all requisite clean-up and testing associated with the removal in accordance with all of the federal, state, and local environmental

requirements. 10. Remove existing fire hydrant and associated piping as indicated. 10. Remove existing valve, valve box, pedestal type hose bib, and associated piping as indicated. 11. Remove existing bollards where indicated. 12. Remove existing concrete ductbank and conduits back to the building as indicated. 13. Remove existing double wall fuel supply and return pipes back to the building as indicated. Nathalie Zielinski Alternative