Closed
Save

Elevator Modernization Conceptual Design and Technical Specifications

U.S. Treasury > Bureau of Engraving & PrintingSol: 2031ZA26Q00100
SBFFP
est. $150K – $450K

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of the Treasury is procuring elevator modernization services for the Bureau of Engraving and Printing. The contractor will develop bridging documents for the repair of seventeen electric elevators, including upgrades to obsolete components and compliance with regulations, while minimizing disruption to operations and achieving sustainability goals.

Generated 35d ago

Scope & Requirements

The contractor will create detailed bridging documents for the modernization of elevators, ensuring compliance with various regulations and integration with existing systems.

Contract Details

Contract Typei
FFP
Estimated Value
est. $150K – $450K
Similar contracts award $72K to $885K (median $262K, 101,961 awards)Within typical range
NAICS Codes
Place of Performance
Washington, DC, USA
Set-Asides
SB

Qualifications & Eligibility

Set-Aside Category
SDVOSB

Agency & Contact

Contracting Organization

Agency
TREASURY, DEPARTMENT OF THE
Sub-Agency
Bureau of Engraving and Printing

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published1mo ago
Jun 18, 2026
Site Visit Information Amendment Issued1mo ago
Jun 18, 2026
Became Solicitation1mo ago
Jun 18, 2026
Tracked
Last Updated1mo ago
Jun 20, 2026
Response Due3d ago
Jul 21, 2026

Description

18 June 2026 - Issue amendment 0001 to update Attachment 1 - Site Visit Information. The Contractor shall develop bridging documents, consisting of conceptual design, technical specifications, and performance criteria for the complete repair of seventeen electric elevators (12 passenger and 5 freight as identified in the 2024 Elevator Assessment) replacing all components that are obsolete and/or have reached end-of-life, including MEP systems upgrades, ACM abatement, PCBs removal, structural and architectural alterations to bring the existing machine rooms and hoistways up to code. New elevator controllers shall be integrated with BEP’s existing Supervisory Control and Data Acquisition (SCADA) system. The bridging documents should provide enough detail to allow successful solicitation of a design-build construction contract addressing complete alteration of the elevators. The Contractor shall ensure compliance with all federal, state, and local regulations, minimize disruption to building operations during installation and achieve targeted energy savings and sustainability goals. Marico Sellers Contracting &C STREET, SW (No Street Address

2) WASHINGTON, DC 20228 USA to this opportunity. 2031ZA26Q00100 0001.pdf Attachment 1 - Site Visit Information

18 June 2026.pdf Attachment 4 - DCF Wage Determination.pdf Attachment 3 -

Pricing Schedule.xlsx Attachment 2f - 2024 Elevator Assessment - REDACTED_Redacted.pdf Attachment 2d - 75D-07.0-07 Restricted Materials at DCF.pdf

Attachments 2b - 75B-07.0-05 EHS

Requirements for Purchased Materials.pdf Attachment 2c - 75B-07.0-06 EHS

Get matched to contracts like this daily

Free AI-powered contract matching for your business.