Replace HVAC System in DNA Laboratory at West Haven VA Medical Center

Veterans Affairs (VA)Sol: 36C24126Q0602
SDVOSB

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Contract Details

Value
Similar contracts award $13K to $123K (median $35K, 14,626 awards)
NAICS Codes
Set-Asides
SDVOSB

Agency & Contact

Contracting Organization

Agency
VETERANS AFFAIRS, DEPARTMENT OF

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published18d ago
Jul 7, 2026
Became Special Notice17d ago
Jul 7, 2026
Tracked
Last Updated15d ago
Jul 9, 2026
Response Due11d ago
Jul 13, 2026

Description

1 SOLICITATION NO. 36C24126Q0602 DATE: 7/7/2026 1. THE SOLICITATION IS HEREBY AMENDED AS FOLLOWS: The following

Questions and Answers, submitted by prospective offerors by July 3, 2026, are incorporated into this solicitation. The Government s responses modify and/or clarify the solicitation. All other terms and conditions of the solicitation remain unchanged. Vendors are reminded to review all other aspects of the solicitation and consider this amendment when preparing their responses. 2. RFI

QUESTIONS AND ANSWERS SOW refers to steam coil timeline under qualifications which appears to be a typo error as the scope does not appear to include steam coil. Please confirm. The reference to steam coil timeline in the Qualifications section of the SOW is a typographical error. The project scope does not include any steam coil components or steam system work. Offerors should disregard this phrase. SOW item 5 and 8 refer to replacement of approximately 275 feet of line sets from the branch box to the condenser, however it does not seem to mention replacement of the piping from the branch box to each evaporator (of which there are 7 listed in the scope. Please confirm if the refrigerant piping from the branch box to each evaporator will also need to be replaced. All piping associated with refrigerant must be replaced. Please confirm if standard 脗陆 insulation is acceptable for refrigerant lines or if VA specification 230711 will need to be followed requiring 1 insulation. Standard for this project is acceptable. Please confirm zoom lock refrigerant piping is not acceptable as per typical VA standards. Braze only. SOW mentions connecting to the branch box but not replacing it. If the branch box is a different refrigerant type, it is assumed that it would need to be replaced. Please confirm. Must replace. Please confirm the VRF system is not to be connected to JCI or Siemens building management DDC system. Not Connected. SOW item 9 states the VA will connect electrical service to the unit. Please confirm this includes all power wiring required to each evaporator and branch box and condenser. The VA will only supply power to the main disconnect. The VA will NOT be connecting to any other power source. Please advise if new thermostats and low voltage interlock wiring is required, or if it is anticipated that the existing controllers and wiring are to be reused. New is required, no use of existing. Please advise if the replacement will need to take place during fall after cooling is not needed, or if the system is not functional and replacement is able to be performed during summer. Can and should be done prior to end of cooling season. Unit is not operational. Will the sign-in sheet from site visit be available in addendum? No. Please confirm if tax should be included in our proposal? Will an exempt certificate be provided? Contractors are required to include all applicable taxes in their proposed prices unless the solicitation states otherwise. A tax-exempt certificate will be provided for purchasing materials for use in a tax exempt government project if state law requires it. What are the ICRA level

requirements in the work areas with piping and evaporators? All work shall comply with the

requirements applicable to each individual work location. The required equal level shall be determined based on the specific

scope of work, the patient risk, and the occupancy of the area in which the work is being performed. The contractor is responsible for complying with all infection control measurements. Is the use of temporary plastic wall panels (such as STARC panels) acceptable to meet ICRA