ActiveOpen for Bids
Save

Repair Stormwater Spill Gate 11 Structure at Tinker Air Force Base

Department of Defense (DoD)Sol: FA813726R0032
WOSBFFP
est. $75K – $470K
Quick Brief

The Department of Defense is procuring construction services for the repair of the Stormwater Spill Gate 11 structure at Tinker Air Force Base in Oklahoma. Key requirements include furnishing all necessary materials, labor, and equipment to restore the concrete spill gate structure and reestablish channel flow for stormwater management. Interested contractors must attend an initial site visit and submit proposals by the specified due date.

Generated 23h ago

Can you win this contract?

Get your fit score, win probability, and required capabilities.

Fit Score7/10Consider

Scope & Requirements

The project involves repairing the concrete spill gate structure at Tinker Air Force Base to restore stormwater channel flow. This includes all necessary materials, labor, and equipment.

Contract Details

Contract Typei
FFP
Estimated Value
est. $75K – $470K
Similar contracts award $44K to $1.1M (median $204K, 8,310 awards)Within typical range
NAICS Codes
Place of Performance
Tinker Air Force Base, Oklahoma, USA
Set-Asides
WOSB

Qualifications & Eligibility

Set-Aside Category
WOSB

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Initial Site Visit RSVP Deadline1mo ago
Jun 12, 202614:00
Mandatory
RFI Due Date1mo ago
Jun 25, 202614:00
Published2d ago
Jul 23, 2026
Became Solicitationyesterday
Jul 23, 2026
Tracked
Last Updatedtoday
Jul 24, 2026
Proposal Due Datein 16d
Aug 10, 202614:00
Response Duein 17d
Aug 10, 2026

Description

The PRE-BID RFI responses have been uploaded. The proposal due date is

10 Aug 2026 NLT 02:00PM CST. UPDATE

22 June 2026 The site visit sign in sheet has been posted. The RFI due date is

25 June 2026 at 2:00 PM CST. This posting is for Tinker AFB – WOSB construction contractors with NAICS 237990. Project Solicitation Number: FA813726R0032 Project Title: Project Location: Tinker Air Force Base - The work to be performed under the terms of this Order consists of furnishing all materials, labor, plant, tools, transportation, equipment, testing services, quality control and incidentals required to accomplish the repair of the concrete spill gate structure (Spill Gate 11 / Outfall

9) to reestablish the existing channel flow that conveys stormwater upstream from within TAFB outside the perimeter fence via Solider Creek at Tinker Air Force Base (AFB), Oklahoma (reference the project drawings for additional location information). Project specific documents are attached to this posting. If you experience any difficulty at receiving or access to the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission. In the email, please provide email addresses for Prime Contractor ONLY points of contact to have the DoD Safe link sent to. Do not include any Sub-Contractor email addresses. After review of the attached project specific documents, if you are interested to attend the Initial Site Visit, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. The POC emails are [email protected] and [email protected]. Your RSVP email must be received by 2:00pm CT on

12 June 2026. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. After receipt of your RSVP and EAL if required, an Initial Site Visit will be coordinated. You must attend the Initial Site Visit for the project to be considered eligible to propose. The proposal will be due

Get matched to contracts like this daily

Free AI-powered contract matching for your business.