Closed
Save

Install Level 2 FRP Over Laboratory Ceilings

Health & Human Services (HHS) > CDC
HUBZone
est. $25K – $399K

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The CDC is procuring a contractor to repair and refinish gypsum board ceilings and walls in laboratory and support spaces at Building 401, Fort Collins campus. Key requirements include installing FRP panels, complying with health and safety regulations, and minimizing disruption to ongoing operations.

Generated 57d ago

Scope & Requirements

Repair and refinish gypsum board ceilings and walls in laboratory, laboratory support, corridors, and ancillary spaces. Install FRP panels, comply with health and safety regulations, and minimize disruption to ongoing operations.

Deliverables

  • Installation of FRP panels and trim
  • Demolition of delaminated ceiling portions
  • Surface preparation
  • Sealing
  • Temporary barriers and dust control
  • Protection and temporary modification of fire protection systems

Contract Details

Estimated Value
est. $25K – $399K
Similar contracts award $25K$400K (median $99K, 73,582 awards)Within typical range
Period of Performance
180 days after Notice to Proceed
NAICS Codes
Place of Performance
Fort Collins, CO, USA
Set-Asides
HUBZone

Qualifications & Eligibility

Set-Aside Category
HUBZone
Past Performance
3 similar contracts in 3 years

Agency & Contact

Contracting Organization

Agency
HEALTH AND HUMAN SERVICES, DEPARTMENT OF
Sub-Agency
Centers for Disease Control and Prevention

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published2mo ago
Mar 25, 2026
Last Updated2mo ago
Mar 25, 2026
Response Due2mo ago
Apr 9, 2026

Description

The Centers for Disease Control and Prevention (CDC) requires a contractor to repair and refinish gypsum board ceilings and walls in laboratory, laboratory support, corridors, and ancillary spaces on the second floor of Building 401 at the CDC Ft. Collins campus. The primary work includes covering designated gypsum board ceilings with smooth, white fiberglass reinforced polymer (FRP) panels and trim, installed to match existing installations in the building. The contractor will be responsible for all materials, equipment, labor, and supervision necessary to complete the work, including demolition of delaminated ceiling portions, surface preparation, installation of FRP panels and trim, sealing, and coordination with CDC for phased access to work areas. The project also requires compliance with all applicable health, safety, and environmental regulations, provision of temporary barriers and dust control, protection and temporary modification of fire protection systems, and coordination of work to minimize disruption to ongoing CDC operations. All work must be performed in accordance with the contract documents, drawings, and specifications provided by the Government.

Period of Performance: Completion is required within 180 days after Notice to Proceed. Minimum Vendor Qualifications: Offerors must demonstrate at least three years of experience with similar construction and interior finish projects. Brad Edwards Contracting (No Street Address

2) ATLANTA, GA 30333 USA to this opportunity. A21d. Employee Non-Disclosure Agreement.docx A21d. Contractor's Non-Disclosure Agreement.docx Updated Wage Determination.txt 100 Percent CD Specifications.pdf 100 Percent CD Drawings.pdf Latest Statement of Work.pdf A19. Solicitation - 75D301-26-R-73423.pdf A19.1

Get matched to contracts like this daily

Free AI-powered contract matching for your business.