Closed
Save

Travis Afb Commissary Roof Replacement

Department of Defense (DoD)
FFP
est. $100K – $500K

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of Defense is procuring a roof replacement for the DeCa Commissary at Travis AFB, CA. The project involves removing the existing roof membrane and insulation, installing new insulation and a 90-mil EPDM single ply roof system, and ensuring compliance with manufacturer specifications. Contractors must follow specific installation guidelines and acknowledge any amendments during the proposal submission process.

Generated 13d ago

Scope & Requirements

The project includes the removal and disposal of the existing roof membrane and insulation, installation of new insulation and a 90-mil EPDM single ply roof system, and necessary repairs to the decking.

Attachments

No files on SAM.gov

This listing does not include downloadable attachments. The solicitation details may be in the description below.

Verify on SAM.gov

Contract Details

Contract Typei
FFP
Estimated Value
est. $100K – $500K
Similar contracts award $25K$400K (median $99K, 73,582 awards)Within typical range
NAICS Codes
Place of Performance
Dallas, TX, USA

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published14d ago
May 21, 2026
Last Updated14d ago
May 21, 2026
Became Solicitation13d ago
May 21, 2026
Tracked
Response Due3d ago
Jun 1, 2026

Description

Solicitation Number: GNFR-FC TRA-26-26408 Travis AFB, CA - DeCa Commissary Roof Replacement Project Number 3784-25-000008 This project will remove and lawfully dispose of or provide for recycling the existing single ply membrane, and flashings, exposing the existing polyisocyanurate insulation at the low-sloped roofs. Install designated insulation and cover board over the existing insulation and decks scheduled to remain. Replace discovered damaged decking that is scheduled to remain, repair metal deck at abandoned equipment locations. Install specified insulation, cover board and new roof membrane. Install a new, white, 90-mil, Class “A”, EPDM single ply roof system. The roof system shall be installed per manufacturer’s

requirements and specifications and will qualify for the roof system manufacturer’s installation certificate. Install protective surfacing for roof traffic. The roof system shall be constructed of specified manufacturer’s materials, to meet uplift resistance. In order to participate in this solicitation, please refer to the link provided below. All solicitation documents will be posted on our website. Any and all amendments will be posted on our website, and must be acknowledged, when submitting a proposal. https://odin.aafes.com/ConstructionSolicitations/ Chris Bohl Contracting (No Street Address

2) DALLAS, TX 75236-1598 USA to this opportunity.

Get matched to contracts like this daily

Free AI-powered contract matching for your business.