Closed
Save

Cottonwood Pile Dike Repairs

Department of Defense (DoD) > U.S. Army > Engineer Division Northwestern District PortlandSol: W9127N26BA005CottonwoodPileDikeRepairs-Solicitation
SBFFP
$44K – $1.1M per task order

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of Defense is procuring repairs for the Cottonwood Pile Dike located on the Lower Columbia River in Cowlitz County, Washington. The project involves focused repairs to sections of pile dikes that have lost visible piles, including enrockment repair and enhancement, with work limited to specific areas to address shoreline erosion. This is a Total Small Business Set-Aside and will result in a single fixed-price contract awarded to the lowest priced, responsible offeror.

Generated 36d ago

Scope & Requirements

The work includes repairs to pile dikes, enrockment repair, and enhancement to address erosion, with specific areas targeted based on survey data.

Contract Details

Contract Typei
FFP
Contract Value
$44K – $1.1M per task order
IDIQ ceiling: $45M, 1 awardee
Similar contracts award $44K to $1.1M (median $204K, 8,310 awards)
Expected Awards
1
NAICS Codes
Place of Performance
Cowlitz County, Washington, USA
Set-Asides
SB

Qualifications & Eligibility

Set-Aside Category
Total Small Business
NAICS Size Standard
$45.0 million

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
US Army Corps of Engineers
Office
Engineer Division Northwestern District Portland

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Solicitation Closing Date2mo ago
May 15, 2026
Response Due2mo ago
May 15, 2026
NEPA Process Completion2mo ago
May 31, 2026
Published1mo ago
Jun 18, 2026
Became Solicitation1mo ago
Jun 18, 2026
Tracked
Became Special Notice1mo ago
Jun 18, 2026
Tracked
Became Presolicitation1mo ago
Jun 18, 2026
Tracked
Last Updated1mo ago
Jun 19, 2026

Description

17 June 2026 - W9127N26BA0050003 Cottonwood Pile Dike Repairs Upon request, the full bid abstract has been attached to this posting.

30 April 2026 - Amendment W9127N26BA0050003 Cottonwood Pile Dike Repairs The purpose of this amendment is to incorporate by full text RFO Clause 52.222-90 Addressing DEI Discrimination by Federal Contractors (APR

2026) (DEVIATION APR

2026) into Specification Section 00 70 00 Conditions of the Contract.

21 April 2026 - Amendment W9127N26BA0050002 Cottonwood Pile Dike Repairs This amendment effects changes to the Solicitation Plan Set, Drawing C-601 TIMBER PILE AND STEEL MARKER PILE SCHEDULE, Table STEEL MARKER PILE SCHEDULE. The Solicitation Period is extended by 14 calendar days which changes the Solicitation Closing Date from May 01, 2026, to May 15, 2026. Attached "Solicitation Amendment W9127N26BA0050002 SF 30" provides a summary of changes incorporated by this amendment and attachment "W9127N26BA0050002 Plan Sheet - C-601-TIMBER PILE AND STEEL MARKER PILE SCHEDULE" provides an updated plan containing the changed steel pipe pile data.

21 April 2026 - Amendment W9127N26BA0050001 Cottonwood Pile Dike Repairs This amendment effects changes to Specification Section 01 57 19.00 25 TEMPORARY ENVIRONMENTAL CONTROLS, Part 3 EXECUTION, Paragraph 3.2.3 Nesting Birds, Subparagraph b.(4)(d). Attachment "Solicitation Amendment W9127N26BA0050001 SF 30" provides a summary of the changes incorporated by this amendment and attachment "AMD0001_technicalsection" provides a revised copy of the entire specification section with the changes incorporated. W9127N26BA005 Cottonwood Pile Dike Repairs The project is located between River Mile 68 and River Mile 72 on the Lower Columbia River in Cowlitz County, Washington. The project allows for focused, cost-effective repairs to select sections of individual structures. Repair areas are limited to sections of pile dikes that have experienced loss of all, or the majority of, visible piles to the extent that hydraulic function is assumed to be severely compromised. The work includes enrockment repair/enhancement areas at ten pile dikes and a shore connection with an offset pile dike at five of the pile dikes. The offset pile dikes and shore connection are in areas where there is visual evidence of shoreline erosion and a lack of sufficient remnant shore connection and the potential for additional erosion exists. The enrockment repair/enhancement sections in repair areas are offset a sufficient distance from the existing pile line to allow for placement of stone without removal of any pile. All debris within the rock placement areas that would interfere with stone placement shall be removed prior to stone placement. Debris will be removed from the site and disposed of at an approved upland facility. Debris removal

Get matched to contracts like this daily

Free AI-powered contract matching for your business.