Closed
Save

Carbon Filter Pellet Removal and Replacement for Air Force Filtration Equipment

Department of Defense (DoD) > U.S. Air Force > Pacific Air ForcesSol: FA500026Q0027
TBD
est. $85K – $140K

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The U.S. Air Force is procuring professional carbon filter maintenance services for spray booth facilities at Joint Base Elmendorf-Richardson, Alaska, requiring the removal and disposal of 34,000 lbs of spent carbon pellets and the installation of new 4mm carbon pellets in strict accordance with OEM guidelines, including provision of all labor, materials, equipment, and tools.

Generated 29d ago

Scope & Requirements

Perform bulk carbon filter exchange for Bristol Environmental & Engineering Model CD-6626-PSB-82-ARC spray booths, including removal and disposal of 34,000 lbs of spent carbon pellets and installation of new 4mm carbon pellets per OEM instructions, using provided equipment and tools.

Deliverables

  • Removal and legal disposal/recycling of 34,000 lbs of spent carbon pellets
  • Installation of 34,000 lbs of new 4mm carbon pellets
  • Compliance with OEM installation instructions
  • Provision of all necessary equipment and specialized tools

Contract Details

Contract Type
TBD
Estimated Value
est. $85K – $140K
Similar contracts award $2K$32K (median $10K, 299 awards)Above typical range
NAICS Codes
Place of Performance
Joint Base Elmendorf-Richardson, AK, US

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
Department of the Air Force
Office
Pacific Air Forces

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published1mo ago
May 5, 2026
Became Solicitation29d ago
May 5, 2026
Tracked
Last Updated28d ago
May 7, 2026
Response Deadline16d ago
May 19, 202616:00
AKDT
Response Due15d ago
May 20, 2026

Description

The 3rd Maintenance Squadron (3rd MXS) Fabrication Flight, located at Joint Base Elmendorf-Richardson (JBER), AK, requires professional filter maintenance services for Bristol Environmental & Engineering Model CD-6626-PSB-82-ARC spray booth facilities. The contractor shall provide all labor, materials, equipment, and tools necessary to perform a bulk carbon filter exchange. 1. Carbon Supply Delivery and installation of 34,000 lbs of 4mm particle carbon pellets. 2.Old Carbon Removal Responsible for the removal, shipment, and legal disposal and/or recycling of all spent carbon material. 3. Installation Installation of new carbon must strictly adhere to the Original Equipment Manufacturer (OEM) instructions. 4. Equipment Contractor is responsible for furnishing all equipment and specialized tools required to complete the maintenance. Alex McWilliams Alternative

Point of Contact Joseph Ford to this opportunity. Sources Sought for Carbon Filter Pellet Removal and Replacement Joint Base Elmendorf-1.pdf

Get matched to contracts like this daily

Free AI-powered contract matching for your business.