The Department of Energy is contracting for Phase 1 construction of the Critical Infrastructure Recovery & Renewal Project at Princeton Plasma Physics Laboratory. The project includes the replacement of substation transformers and switchgear, with a total procurement magnitude exceeding $10 million and a performance period of 365 days post-award. A pre-proposal videoconference and site visit are mandatory for proposal submission.
Get your fit score, win probability, and required capabilities.
The work involves the construction and replacement of critical electrical infrastructure components at the Princeton Plasma Physics Laboratory.
This listing does not include downloadable attachments. The solicitation details may be in the description below.
Verify on SAM.govThe Trustees of Princeton University, a U.S. Department of Energy Prime Contractor, represented by Princeton Plasma Physics Laboratory (PPPL) has a requirement for a qualified and capable contractor to perform the Phase 1 construction of the Critical Infrastructure Recovery & Renewal (CIRR) Project located at Princeton Plasma Physics Laboratory, 100 Stellarator Road, James Forrestal Campus, US Route 1 North, Princeton, NJ. The work includes: Base Scope: - Replacement of XQT-1 Substation Transformer in C-Site 138kV Yard and associated cabling. - Replacement of XVT-1 Substation Transformer in C-Site 138kV Yard and associated cabling. - Replacement of Q1 Switchgear in Building C51 and replacement of associated cabling to the existing XQT-2 Substation Transformer. Option 1: - Replacement of Substation 2 & 17 in the C22 Laboratory Building. New equipment furnished by PPPL. For a detailed description of the work
requirements, please review the PPPL Statement of Work contained in Section I of the RFP. The magnitude of this procurement exceeds $10 million inclusive of the option items. The
period of performance is 365 calendar days after subcontract award. The applicable NAICS code is 236220, Commercial and Institutional Building construction. The procurement is unrestricted (full and open competition). The full RFP may be reviewed and downloaded at https://sites.google.com/pppl.gov/procurement/opportunities?authuser=0, by clicking on the "Procurement Opportunities" link and then on the appropriate RFP link. Click on RFP 26-056-CM and download and save the file to your computer. Open to view the RFP documents using the latest version of Adobe Reader or Acrobat. You will not be able to view the documents using your internet browser. A Pre-Proposal Videoconference is scheduled for 10:00 AM (EST), July 10, 2026, and a Site Visit scheduled for July 14, 2026. Firms must return the RFP Acknowledgement Form contained in the RFP to receive information to the Zoom information. Attendance of both the Pre-Proposal Videoconference and Site Visit is pre-requisite for proposal submission. Proposals are due to PPPL by 4:00 PM (EST), Friday, August 7, 2026. This announcement shall not commit PPPL to issue a subcontract for this effort, or to pay any costs incurred by offerors in the preparation and submittal of proposals in response to this RFP. Chi Man Cheung Contracting . (No Street Address