The response deadline has passed. Review the details for future reference or to track similar opportunities.
The Department of Defense is procuring adhesive materials for the Navy, specifically requiring four total deliveries of 75 containers each, with the first delivery scheduled for April 8, 2026. Vendors must comply with various quality and inspection standards, and a review of the IRPOD is mandatory.
The contractor will provide adhesive materials, ensuring compliance with specified quality and inspection standards.
This listing does not include downloadable attachments. The solicitation details may be in the description below.
Verify on SAM.gov(JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)|1|MIL-I-45208| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X|||||| STOP-WORK ORDER (AUG 1989)|1|| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORTS (COMBO)|N/A|TBD|N00104|TBD|TBD|SEE SCHEDULE|TBD|N/A|N/A|N/A|||||| INSPECTION SYSTEM PROGRAM PLANS, OR PREMANUFACTURING OR TEST PROCEDURES|1|45| NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL
REQUIREMENTS (NOV 2025))|1|| FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS-PROHIBITION (DEC 2023)|12||||||||||||| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND2025-O0004))|13|325520|550|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| EVALUATION-COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (DEV 2026-O0028)(FEB 2026))|3|||| OFFER DUE DATE HAS BEEN UPDATED TO
24 FEBRUARY 2026. PROVISIONS HAVE BEEN UPDATED DUE TO FAR UPDATES. QUANTITY CHANGED FROM 300 TO 160. THE NEW DELIVERY SCHEDULE WOULD BE: 4 TOTAL DELIVERIES, EACH FOR A QTY OF 40 CN. THE FIRST DELIVERY SHOULD TAKE PLACE ON OR AROUND 04/08/2026 (or ASAP) WITH THE FOLLOWING SHIPMENTS DUE IN EVERY 90 days. DUE DATE REMAINS THE SAME. PROVISIONS REFLECT UPDATE FROM 31 JANUARY 26. A MATERIAL IRPOD IS AVAILABLE AT THE BPMI SITE. VENDOR REVIEW OF THE IRPOD IS MANDATORY. UNLESS OTHERWISE SPECIFIED,
PRICING FOR THIS QUOTATION IS VALID FOR 60 DAYS AFTER THE CLOSING DATE AS INDICATED ON THE QUOTATION. PLEASE SPECIFY (IF OTHER THAN 60 DAYS) ______________ DAYS. IF YOU ARE SUBMITTING YOUR QUOTE VIA EMAIL OR NECO, PLEASE SPECIFY THE NUMBER OF DAYS
PRICING IS VALID. ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERS, DELIVERY ORDERS AND MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE 'ISSUED' BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO 'ISSUE' CONTRACTUAL DOCUMENTS AS DETAILED HEREIN. DD1423 IS REQUIRED FOR MATERIAL CURE DATE CERTIFICATION. PLEASE SEE IRPOD FOR SHELF-LIFE REQUIREMENT. PLEASE PROVIDE ANY REQUESTED WAIVERS, EXCEPTIONS, OR ALTERNATE SUBMITTAL REQUESTS AT TIME OF QUOTE SUBMISSION DRAWINGS, SPECIFICATIONS, OR RELATED TECHNICAL DOCUMENTS AS CITED IN THE IRPOD ARE SUBJECT TO SPECIAL EXPORT CONTROLS AND EACH TRANSMITTAL TO FOREIGN GOVERNMENTS OR FOREIGN NATIONALS MAY BE MADE ONLY WITH PRIOR APPROVAL OF THE NAVAL SEA SYSTEMS COMMAND. THE FOLLOWING APPLIES IF REPORTS OF TEST AND INSPECTION (ROTI) ARE REQUIRED: THE RECOMMENDED METHOD FOR ROTI SUBMITTALS IS VIA WAWF OR AN ALTERNATIVE HIGH QUALITY ELECTRONIC MEANS (ie: FAX OR EMAIL YOUR POST AWARD POC). A DEDICATED ROTI FAX HAS BEEN ADDED FOR YOUR SUBMITTAL CONVENIENCE. THIS MATERIAL SHOULD HAVE 4 TOTAL DELIVERIES, EACH FOR A QTY OF 75 CN. THE FIRST DELIVERY SHOULD TAKE PLACE ON OR AROUND 04/08/2026 WITH FOLLOWING SHIPMENTS DUE IN EVERY 90 DAYS. DELIVERY QTY DATE (1) 75 CN ON OR AROUND 08 APRIL 26 (2) 75 CN 90 DAYS AFTER FIRST DELIVERY (3) 75 CN 180 DAYS AFTER FIRST DELIVERY (4) 75 CN 270 DAYS AFTER FIRST DELIVERY \ 1. SCOPE 1.1 In the event of a conflict between section "C" and section "D" of the contract/purchase order, Section "C" will take precedence. 2. APPLICABLE DOCUMENTS 2.1 NOT RELEASABLE TO FOREIGN NATIONALS (NOFORN) DISTRIBUTION STATEMENT - DRAWINGS, SPECIFICATION, OR RELATED TECHNICAL DOCUMENTS AS CITED IN THE IRPOD ARE SUBJECT TO SPECIAL EXPORT CONTROLS AND EACH TRANSMITTAL TO FOREIGN GOVERN MENTS OR FOREIGN NATIONALS MAY BE MADE ONLY WITH PRIOR APPROVAL OF THE NAVAL SEA SYSTEMS COMMAND. 2.2 Applicable Documents; TECHNICAL DOCUMENTS ASSOCIATED TO THIS SOLICITATION OR AWARD SUCH AS; IRPOD, DRAWINGS,TECHNICAL DATA, STRs, AS WELL AS CERTAIN MILITARY SPECIFICATIONS, AND COMMERCIAL ITEM DESCRIPTIONS (CID) ETC. MAY BE OBTAINED AT (HTTPS://LOGISTICS.UNNPP.GOV/ECOMMERCE) THESE DOCUMENTS, AT THE REQUIRED REVISION LEVELS THAT ARE ASSOCIATED TO EITHER THIS SOLICITATION OR AWARD, BECOME A PART OF THIS SOLICITATION OR AWARD UNLESS CHANGED BY AN ADMENDMENT TO THE SOLICITATION OR MODIFICATION TO THE AWARD. THIS WEBSITE REQUIRES A PASSWORD AND PRE-REGISTRATION. TO OBTAIN INSTRUCTION ON HOW TO REGISTER AND OBTAIN A PASSWORD CONTACT THE BPMI WEBSITE ADMINISTRATOR. 3.
REQUIREMENTS 3.1 NAVSUP WSS-MECH CODE N94 ADDITIONAL TECHNICAL DOCUMENTATION ORDER OF PRECEDENCE AND EFFECTIVE ISSUES OF CITED DOCUMENTATION DATED: JULY 2004
Get matched to contracts like this daily
Free AI-powered contract matching for your business.