The response deadline has passed. Review the details for future reference or to track similar opportunities.
The Department of Defense is procuring spacers, rings, and shims for use in a crucial shipboard system, emphasizing the need for high-quality materials to prevent serious personnel injury or loss of vital systems. The procurement is designated as a total small business set-aside.
The contractor will provide spacers, rings, and shims that meet stringent quality requirements for a shipboard system, ensuring safety and operational integrity.
|4|N743.35|WWV|717-605-8399|[email protected]| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|SEE SPECIFICATIONS SECTION C AND SECTION E | INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X|||||| GENERAL INFORMATION-FOB-DESTINATION|1|A| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)||TBD|N00104|TBD|TBD|N50286|TBD|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|ONE YEAR|365 DAYS AFTER THE LAST DELIVERY UNDER THIS CONTRACT ||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND2025-O0004))|13|332119 |500|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| 1.DD1423 Data Item A001 (Inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mechanicsburg. 2. All contractual documents (i.e. contracts, purchase orders, task orders,delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed here in. 3.The following proposed delivery schedule applies: Submission of all certification data CDRLS 20 days prior to delivery. PNSY review/acceptance of certification CDRLS 18 working days after receipt Final delivery of material (186 days) \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 1.1.1 DSSP Scope of Certification Material - Material Control Division ;(B); applies to this material. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.2.2 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. 2.2.3 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. DRAWING DATA=7106789 |53711| A| |D|0000.A | A|49998|0057907 DRAWING DATA=7106789 |53711| A| |D|0001 | A|49998|0083703 DRAWING DATA=7106789 |53711| A| |D|0002.1 | A|49998|0064337 DRAWING DATA=7106789 |53711| A| |D|0002.2 | A|49998|0030344 DRAWING DATA=7106789 |53711| A| |D|0003 | A|49998|0012181 DRAWING DATA=7106789 |53711| A| |D|0004 | A|49998|0011278 DRAWING DATA=7106789 |53711| A| |D|0005 | A|49998|0031159 DRAWING DATA=7106789 |53711| A| |D|0006.1 | A|49998|0059796 DRAWING DATA=7106789 |53711| A| |D|0006.2 | A|49998|0049909 DRAWING DATA=7106789 |53711| A| |D|0006.3 | A|49998|0052242 DRAWING DATA=7106789 |53711| A| |D|0006.4 | A|49998|0055606 DRAWING DATA=7106789 |53711| A| |D|0006.5 | A|49998|0013303 DRAWING DATA=7106789 |53711| A| |D|0007.1 | A|49998|0026558 DRAWING DATA=7106789 |53711| A| |D|0007.10 | A|49998|0049769 DRAWING DATA=7106789 |53711| A| |D|0007.11 | A|49998|0050585 DRAWING DATA=7106789 |53711| A| |D|0007.12 | A|49998|0046644 DRAWING DATA=7106789 |53711| A| |D|0007.13 | A|49998|0042772 DRAWING DATA=7106789 |53711| A| |D|0007.14 | A|49998|0044979 DRAWING DATA=7106789 |53711| A| |D|0007.15 | A|49998|0046363 DRAWING DATA=7106789 |53711| A| |D|0007.16 | A|49998|0045965 DRAWING DATA=7106789 |53711| A| |D|0007.17 | A|49998|0043511 DRAWING DATA=7106789 |53711| A| |D|0007.18 | A|49998|0044719 DRAWING DATA=7106789 |53711| A| |D|0007.19 | A|49998|0045152 DRAWING DATA=7106789 |53711| A| |D|0007.2 | A|49998|0038885 DRAWING DATA=7106789 |53711| A| |D|0007.20 | A|49998|0047425 DRAWING DATA=7106789 |53711| A| |D|0007.21 | A|49998|0046361 DRAWING DATA=7106789 |53711| A| |D|0007.22 | A|49998|0050435 DRAWING DATA=7106789 |53711| A| |D|0007.23 | A|49998|0048963 DRAWING DATA=7106789 |53711| A| |D|0007.24 | A|49998|0047471 DRAWING DATA=7106789 |53711| A| |D|0007.3 | A|49998|0046064 DRAWING DATA=7106789 |53711| A| |D|0007.4 | A|49998|0047416 DRAWING DATA=7106789 |53711| A| |D|0007.5 | A|49998|0044040 DRAWING DATA=7106789 |53711| A| |D|0007.6 | A|49998|0042925 DRAWING DATA=7106789 |53711| A| |D|0007.7 | A|49998|0043838 DRAWING DATA=7106789 |53711| A| |D|0007.8 | A|49998|0046233 DRAWING DATA=7106789 |53711| A| |D|0007.9 | A|49998|0050473 DRAWING DATA=7106789 |53711| A| |D|0008.1 | A|49998|0029713 DRAWING DATA=7106789 |53711| A| |D|0008.2 | A|49998|0046266 DRAWING DATA=7106789 |53711| A| |D|0008.3 | A|49998|0053664 DRAWING DATA=7106789 |53711| A| |D|0008.4 | A|49998|0049597 DRAWING DATA=7106789 |53711| A| |D|0008.5 | A|49998|0051963 DRAWING DATA=7106789 |53711| A| |D|0008.6 | A|49998|0017503 DRAWING DATA=7106789 |53711| A| |D|0008.7 | A|49998|0013822 DRAWING DATA=7106789 |53711| A| |D|0009 | A|49998|0090198 DRAWING DATA=7106789 |53711| A| |D|0010 | A|49998|0096753 DRAWING DATA=7106789 |53711| A| |D|0011 | A|49998|0092233 DRAWING DATA=7106789 |53711| A| |D|0012 | A|49998|0141629 DRAWING DATA=7106789 |53711| A| |D|0013 | A|49998|0112451 DRAWING DATA=7106789 |53711| A| |D|0014 | A|49998|0192285 DRAWING DATA=7106789 |53711| A| |D|0015 | A|49998|0127548 DRAWING DATA=7106789 |53711| A| |D|0016 | A|49998|0157105 DRAWING DATA=7106789 |53711| A| |D|0017 | A|49998|0115447 DRAWING DATA=7106789 |53711| A| |D|0018 | A|49998|0169383 DRAWING DATA=7106789 |53711| A| |D|0019 | A|49998|0094620 DRAWING DATA=7106789 |53711| A| |D|0020 | A|49998|0164998 DRAWING DATA=7106789 |53711| A| |D|0021 | A|49998|0089186 DRAWING DATA=7106789 |53711| A| |D|0022 | A|49998|0152259 DRAWING DATA=7106789 |53711| A| |D|0023 | A|49998|0069845 DRAWING DATA=7106789 |53711| A| |D|0024 | A|49998|0185919 DRAWING DATA=7106789 |53711| A| |D|0025 | A|49998|0116958 DRAWING DATA=7106789 |53711| A| |D|0026 | A|49998|0098830 DRAWING DATA=7106789 |53711| A| |D|0027 | A|49998|0123228 DRAWING DATA=7106789 |53711| A| |D|0028 | A|49998|0105454 DRAWING DATA=7106789 |53711| A| |D|0029 | A|49998|0143922 DRAWING DATA=7106789 |53711| A| |D|0030 | A|49998|0090737 DRAWING DATA=7106789 |53711| A| |D|0031 | A|49998|0169085 DRAWING DATA=7106789 |53711| A| |D|0032 | A|49998|0085407 DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | 3.
REQUIREMENTS 3.1 ;The Spacer must be manufactured in accordance with NAVSEA drawing 7106789 P/N 228, except as amplified or modified herein.; 3.2 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. 3.3 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.3.1 Waivers/Deviations - All waivers and deviations, regardless of significance or require review and approval by the
Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.3.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted to the NAVSUP WSS Contracting Specialist via eMail. 3.3.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineering change. 3.3.4 A copy of the final waiver/deviation (both approved and disapproved) must be forwarded with the applicable asset(s). 3.4 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the
requirements of the procurement document, including any/all invoked specifications and drawings. ^ QUALITY ASSURANCE
REQUIREMENTS ^ 3.5 Quality System
Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system
Get matched to contracts like this daily
Free AI-powered contract matching for your business.