Closed
Save

Country Club West Stoplog Rehabilitation Project

International Boundary & Water Commission: Us-MexicoSol: FY4201010
SBFFP
$25K – $100K

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The United States Section of the International Boundary and Water Commission is procuring services for the rehabilitation of the Country Club west stoplog foundation in El Paso, Texas. Key requirements include installing a new expansion joint, repairing deteriorated concrete, and implementing traffic control measures during construction. The project is estimated to cost between $25,000 and $100,000 and will be performed under a firm-fixed price contract.

Generated 28d ago

Scope & Requirements

The project involves repairing the Country Club Bridge west stoplog foundation, including the installation of a new expansion joint and concrete repairs.

Attachments

No files on SAM.gov

This listing does not include downloadable attachments. The solicitation details may be in the description below.

Verify on SAM.gov

Contract Details

Contract Typei
FFP
Contract Value
$25K – $100K
Similar contracts award $44K to $1.1M (median $204K, 8,310 awards)Within typical range
Period of Performance
90 calendar days after Notice to Proceed
NAICS Codes
Place of Performance
El Paso, TX, USA
Set-Asides
SB

Qualifications & Eligibility

Set-Aside Category
8(a)

Agency & Contact

Contracting Organization

Agency
INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published1mo ago
Jun 25, 2026
Became Solicitation29d ago
Jun 25, 2026
Tracked
Last Updated27d ago
Jun 27, 2026
Response Date15d ago
Jul 10, 202617:00
Solicitation Posting Date15d ago
Jul 10, 2026
This is a target date which may slip or change.
Response Due14d ago
Jul 10, 2026

Description

after INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO NSTRUCTION OF OTHER NON-BUILDING FACILITIES NAICS Code The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a Solicitation (sealed bid) for the purpose of repairing the Country Club Bridge west stoplog foundation located near Sunland Park in El Paso County, Texas. The project generally consists of installing a new expansion joint and repairing deteriorated concrete at the stoplog structure. The proposed repairs will restore movement between the roadway and stoplog foundation structure, reduce further deterioration, and maintain a safe and serviceable bridge approach. Construction activities will require traffic control measures including lane or full closure and coordination with local agencies to maintain safe traffic operations during construction. Major Tasks Include: 1. Mobilization and demobilization. 2. Traffic control permitting, implementation and maintenance. 3. Sawcutting and removal of existing expansion joint materials. 4. Installation of new expansion joint filler, backer rod, and sealant. 5. Repair of deteriorated and spalled concrete surfaces. 6. Disposal of removed materials and construction debris. 7. Final cleanup and closeout activities. Project Location Country Club Rd Bridge, West Levee Approximate Coordinates: 31.846400, -106.606524 Per FAR 36.204, the magnitude of the project is estimated between $25,000 and $100,000. The work is located in El Paso, Texas. A site visit date will be listed in the Solicitation. The work will be performed under NAICS Code 237990. The Contract will be firm-fixed price. The anticipated actual construction duration is approximately two (2) weeks. However, a traffic control permit requires City of El Paso and TxDOT approval for work on the heavily trafficked Country Club Rd. All work shall be completed within ninety (90) calendar days after the Notice to Proceed. The final paperwork for closeout of the Contact shall be completed within thirty (30) calendar days of completion of construction. The time stated for completion shall include final cleanup of the premises. The Solicitation, plans, and specifications are expected to be posted on or about

10 July 2026 (this is a target date which may slip or change). The Solicitation will be available for a minimum of thirty (30) calendar days. This is a Presolicitation Notice. The Solicitation will include information on how to obtain the Philip Johnson Alternative

Point of Contact Angelica Baca Contracting . Mesa (No Street Address

2) El Paso, TX 79902 USA to this opportunity.

Get matched to contracts like this daily

Free AI-powered contract matching for your business.