Closed
Save

Climate Controlled Storage Facility Construction

Department of Defense (DoD) > U.S. Army > Engineer Division SouthwesternSol: W9126G26RA019
SBFFP
est. $2M – $8M

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of the Army is procuring a design-bid-build construction contract for a climate controlled storage facility at the Red River Army Depot in Texas. The project is designated as a 100 percent small business set-aside.

Generated 22d ago

Scope & Requirements

Design-bid-build construction of a climate controlled storage facility at Red River Army Depot.

Deliverables

  • Climate Controlled Storage Facility

Contract Details

Contract Typei
FFP
Estimated Value
est. $2M – $8M
Similar contracts award $25K to $402K (median $99K, 70,896 awards)Above typical range
NAICS Codes
Place of Performance
Texas, USA
Set-Asides
SB

Qualifications & Eligibility

Set-Aside Category
Small Business

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
US Army Corps of Engineers
Office
Engineer Division Southwestern

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published24d ago
Jul 1, 2026
Became Solicitation23d ago
Jul 1, 2026
Tracked
Last Updated21d ago
Jul 3, 2026
Response Due16d ago
Jul 8, 2026

Description

Update 0005 is to issue Amendment 0004. // Update 0004 is to issue Amendment 0003. // Update 0003 is to issue Amendment 0002. // Update 0002 is to issue Amendment 0001 // Update 0001 is to include the Site Visit Sign-In sheet and photos. // The proposed project is a 100% Small Business Set-Aside for a Design-Bid-Build Construction contract for Climate Controlled Storage Facility, Red River Army Depot, Texas.

For details, see attached Solicitation located in the PIEE Solicitation Module.

Kristi MORRIS

Get matched to contracts like this daily

Free AI-powered contract matching for your business.