The response deadline has passed. Review the details for future reference or to track similar opportunities.
The Department of Defense (DEPT OF DEFENSE) is procuring a High Voltage Power Supply (POWER SUPPLY HV) for DLA Maritime. Key requirements include specific cage codes and marking standards.
Manufacture and contract quality requirements for the High Voltage Power Supply (POWER SUPPLY HV).
This listing does not include downloadable attachments. The solicitation details may be in the description below.
Verify on SAM.gov(JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26||||||||||||||||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT|n/a|TBA|SPRMM1|TBA|TBA|TBA|TBA|TBA|TBA|TBA|||||| EQUAL OPPORTUNITY (SEP 2016)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|X|X|X|||X|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2025)|13|335931|600|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| SOLICITATION HAS BEEN HEREBY AMENDED TO EXTEND DUE TO DATE TO
23 APRIL 2026. \ SOLICITATION HAS BEEN HEREBY AMENDED TO EXTEND DUE TO DATE TO
28 NOVEMBER 2025. \ 1. All contractual documents (i.e. contracts, purchase orders, task orders, Delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. 2. No drawings or technical data are available for this item. 3. RFID is only required if the Ship To code identified above is listed at the website with DFARS 252.211-7006 PASSIVE RFID, as the time of shipment.Currently, there are no locations listed that require passive RFID tagging. 4. When submitting quotes via EDI, make sure you specify any exceptions (i.e. Mil specs/standards, packaging, I&A, packaging houses etc) or follow up with a hardcopy of the exceptions. If nothing is indicated or received, award will be based upon solicitation
requirements. Changes or requests for changes after award will have consideration costs deducted on modifications. 5. If supplies will be packaged at a location different from the offeror address, the offeror shall provide the name and street address of the packaging facility. Inspection of material will be at: ______________________________________________________________ Inspection of packaging and final acceptance of material will be at: ______________________________________________________________ Any order resulting from this Request for Quotation will require electronicsubmittal of Receiving Report and Invoices through PIEE-WAWF. \ 1. SCOPE 1.1 This contract/purchase order contains the
requirements for manufacture and the contract quality
requirements for the POWER SUPPLY HV . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 3.
Get matched to contracts like this daily
Free AI-powered contract matching for your business.