Closed
Save

Elevator Modernization Design and Technical Specifications

U.S. Treasury
FFP
est. $69K – $842K

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of the Treasury is procuring elevator modernization services, specifically the development of bridging documents for the repair of seventeen electric elevators. Key requirements include the integration of new elevator controllers with the existing SCADA system, compliance with regulations, and achieving energy savings and sustainability goals.

Generated 17d ago

Contract Details

Contract Typei
FFP
Estimated Value
est. $69K – $842K
Similar contracts award $72K to $885K (median $262K, 101,961 awards)Within typical range
NAICS Codes

Agency & Contact

Contracting Organization

Agency
TREASURY, DEPARTMENT OF THE

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Amendment 0001 Issuance Date1mo ago
Jun 18, 2026
Published19d ago
Jul 6, 2026
Last Updated19d ago
Jul 6, 2026
Amendment 0002 Issuance Date19d ago
Jul 6, 2026
Became Solicitation18d ago
Jul 6, 2026
Tracked
Response Due16d ago
Jul 9, 2026

Description

6 July 2026 - Issue amendment 0002 to 1. Post Responses to

questions. 2. Update Attachment 1 - SOW. 3. Update Section L. 4. Attach document 2e. 5. Attach Site Visit Sign-in sheet.

18 June 2026 - Issue amendment 0001 to update Attachment 1 - Site Visit Information. The Contractor shall develop bridging documents, consisting of conceptual design, technical specifications, and performance criteria for the complete repair of seventeen electric elevators (12 passenger and 5 freight as identified in the 2024 Elevator Assessment) replacing all components that are obsolete and/or have reached end-of-life, including MEP systems upgrades, ACM abatement, PCBs removal, structural and architectural alterations to bring the existing machine rooms and hoistways up to code. New elevator controllers shall be integrated with BEP’s existing Supervisory Control and Data Acquisition (SCADA) system. The bridging documents should provide enough detail to allow successful solicitation of a design-build construction contract addressing complete alteration of the elevators. The Contractor shall ensure compliance with all federal, state, and local regulations, minimize disruption to building operations during installation and achieve targeted energy savings and sustainability goals.

Get matched to contracts like this daily

Free AI-powered contract matching for your business.