Upgrade Steam Distribution System

Veterans Affairs (VA)Sol: 36C24926R0017
FFP
est. $25K – $150K

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of Veterans Affairs is upgrading the steam distribution system at a VA facility to improve heating efficiency and reliability, requiring compliance with mechanical and safety codes, and minimizing operational disruption during construction.

Generated 19d ago

Scope & Requirements

Upgrade of the steam distribution system including piping, valves, controls, and insulation to enhance thermal efficiency and ensure compliance with current mechanical and safety standards.

Contract Details

Contract Typei
FFP
Estimated Value
est. $25K – $150K
Similar contracts award $13K$126K (median $35K, 14,862 awards)Within typical range
NAICS Codes

Agency & Contact

Contracting Organization

Agency
VETERANS AFFAIRS, DEPARTMENT OF

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published21d ago
May 14, 2026
Became Sources Sought20d ago
May 15, 2026
Tracked
Last Updated19d ago
May 16, 2026
Response Due7d ago
May 27, 2026

Description

Title of Project: Project# 626A4-22-202 AJP-Upgrade Steam Distribution System

Scope of Work: The contractor shall furnish all labor, material, equipment and supervision necessary to accomplish the work for Project# 626A4-22-202 "AJP-Upgrade Steam Distribution System at the Tennessee Valley Healthcare System, VA Medical Center, 3400 Lebanon Road, Murfreesboro, TN 37129 in accordance with the specifications and drawings. Work includes demolition and new construction including, but not limited to, general construction, civil, structural, architectural, mechanical, plumbing, electrical, low voltage, industrial hygiene, and certain other items. Statement Of Bid Item(S) BID ITEM 1: Includes all work per drawings and specifications.

Period of Performance: 546 calendar days GENERAL

REQUIREMENTS All work, including materials, will be warranted for a period of one year unless otherwise indicated in the specifications and drawings. Normal working hours are Monday through Thursday from 6 a.m. to 4:30 p.m. Contractor may be required to work some nights and or weekends to perform this work and maintain functionality of affected areas, and to minimize disruptions to the Medical Center s operations. Weekend and evening work shall be identified on the project schedule submitted by the contractor and approved by the VA before work begins. Steam shutdowns will not be allowed if outside temperatures are below 58 F or a temporary means of supporting the building(s) is identified prior to the shutdown. Contractor must consider this when producing a schedule. Outside temperature related issues will result in no additional cost to the government. No clamp-on saddles are allowed in the system. In addition to the specifications and drawing s locations, provide an additional 30 analog pressure gauges to install at locations coordinated with the COR during construction. Ductile and Cast-iron materials are strictly prohibited unless otherwise noted in the specifications and drawings. See specifications and drawings for additional

requirements. ADDITIONAL

ATTACHMENTS Attachment 2A - Regulated Building Materials Survey Report Attachment 2B - Engineering Service Confined Space Entry Policy Attachment 2C - BOD Electrical Condensate Packages END OF STATEMENT OF WORK Jen Jamieson Alternative