The response deadline has passed. Review the details for future reference or to track similar opportunities.
The Department of Defense is procuring the installation of speed awareness signs at four locations on the NUWCDIVNPT campus. Contractors must have an active registration in SAM.gov and are responsible for supplying their own water for the installation. Access to detailed specifications and drawings is required and can be requested through SAM.gov.
The contractor will install government-provided speed awareness signs at specified locations on the NUWCDIVNPT campus.
The contractor will be responsible for the installation of government-provided speed awareness signs at four different locations on the NUWCDIVNPT campus. Please see N6660426Q0349 and all
attachments for complete requirement details. Contractors do not have to be JCP certified to receive the Solicitation, including drawings, specifications, and photos, but they must have an active registration in SAM.GOV. Interested parties should request access to drawings, specifications, and photos within the
attachments section of this solicitation. NUWCDIVNPT will review and approved requests within SAM.GOV. A controlled attachment requires special handling due to the information it contains. You must have a data entry or administrator role within the Contract Opportunities domain for an entity in SAM.gov in order to request access. If you do not have a proper role, you can request it from an existing entity administrator or have the existing administrator assign roles directly to you. If your entity does not have a direct employee, officer or board member appointed as the Entity Administrator, you will need to complete an Entity Administrator Appointment Letter. You must request access to the attachment by clicking on its title and providing the reason you need access. You will not receive immediate access to view the document. The
contracting officer will review your request to grant or reject your access. Your entity is responsible for managing the documents in accordance with prescribed directives. https://www.fsd.gov/gsafsd_sp?id=gsafsd_kb_articles&sys_id=733b9d881bbc71506397ec21f54bcb0a RFI 001: 1. Is water available near each site where you require the speed signs? Answer: No water will be available. 2. If not, do we need to supply our own water source or storage tank? Answer: Contractor will need to supply their own water. Amy Prisco Alternative
Point of Contact Michael Ouellette Contracting (No Street Address
2) NEWPORT, RI 02841-1703 USA to this opportunity. Attachment_7_SITE VISIT INSTRUCTIONS .pdf Attachment_6_NAVSTANPT Soil Management Plan eff2026.02.04.pdf 588.26 KB Controlled May 28, 2026 Attachment_5_08_5090-8 Generator Usage Log.pdf Attachment_4_07_5090-7- Hazmat Usage Log.pdf Attachment_3_Davis Bacon WD.pdf
Get matched to contracts like this daily
Free AI-powered contract matching for your business.