The response deadline has passed. Review the details for future reference or to track similar opportunities.
The Department of Defense is procuring rotary pump units, specifically designed for military applications. Key requirements include compliance with specific design and quality standards, government source inspection, and the necessity for authorized distribution confirmation if the bidder is not the manufacturer.
The contract includes requirements for the manufacture and quality assurance of rotary pump units, ensuring compliance with military specifications.
This listing does not include downloadable attachments. The solicitation details may be in the description below.
Verify on SAM.gov|4|N771.10|WLL & WLA|771-229-0552|[email protected]| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|x||x|||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Material - Invoice & Receiving Report (COMBO)||TBD|N00104|TBD|TBD|see schedule|TBD|see schedule||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS| EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|x||||||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2025)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND2025-O0004))|13|333914|750|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||| Clauses updated per the lastest FAR overhaul changes. Closing date extended. Amended to reduce the quantity required of NIIN 013156667. Closing date extended to 2/6/26. \ The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. Any contract/order awarded as a result of this solicitation will be a DO rated order certified for national defense use under the Defense Priorities and Allocations System (DPAS). See 52.211-14, Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy Program Use. Government source inspection is required. Unit Price:__________ FIRM Total Price:__________ FIRM Procurement Turnaround Time (PTAT) :__________ Awardee CAGE: __________ Inspection & Acceptance CAGE, if not at source:__________ Delivery Vehicle (if Delivery Order requested) (if your company has a current BOA/IDIQ, for example) :__________ Important Traceability Notice: If you are not the manufacturer of the materialyou are offering, you must provide a letter/official email from the OEM confirming your company is an authorized distributor of their items. \ 1. SCOPE 1.1 This contract/purchase order contains the
requirements for manufacture and the contract quality
requirements for the ROTOR,PUMP . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 3.
REQUIREMENTS 3.1 Cage Code/Reference Number Items - The ROTOR,PUMP furnished under this contract/purchase order shall be the design represented by Cage Code(s) reference number(s). Cage _______ ref. no. ;59180 DSC275AE; 3.2 Marking - This item shall be physically identified in accordance with ;MIL-STD-130, REV N,
16 NOV 2012; . 3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH
Contracting Officer has notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation. When notifying the Procurement
Get matched to contracts like this daily
Free AI-powered contract matching for your business.