The response deadline has passed. Review the details for future reference or to track similar opportunities.
The Department of Energy is seeking contractors for the SLAC FEH Optics Lab Construction Project, which involves a firm-fixed-price contract for design-bid-build construction services. Key requirements include demolition, new architectural features, power distribution, HVAC systems, and adherence to high-quality standards while ensuring cost-effectiveness. Interested vendors must have relevant experience and meet specific qualifications related to government contracts.
The project includes construction services such as demolition, installation of new architectural features, and systems like HVAC and power distribution.
"SOURCES SOUGHT ONLY." PLEASE DO NOT SUMBIT BIDS. While the DRAFT RFP package has been included with this post, the RFP has NOT yet been released. Interested Vendors should express their interest on the Interested Vendors List through this SAM.GOV posting or by emailing the procurement specialist. SLAC FEH Optics Lab Construction – Design-Bid-Build SCOPE The FEH Optics Lab Project will be delivered through a firm-fixed-price contract. The base scope includes demolition, new architectural (framing, doors, ceiling, flooring, CSF wall), new power distribution, new light fixtures, new HVAC system, new process piping (with insulation inside the room), controls, leak detection system, fire protection system, cable trays, etc. See construction documents for details. The Subcontractor shall provide all construction services necessary to deliver this project's scope. The Subcontractor shall emphasize cost-effectiveness throughout the project while maintaining high-quality standards and meeting contract
requirements. The Subcontractor shall attend weekly OAC meetings throughout the duration of the work and provide progress updates, scheduling information, and address any issues relevant to the scope. The Subcontractor shall provide electrical demolition plan as part of SLAC electrical readiness review process. MINIMUM QUALIFICATIONS The Offeror’s General Contractor’s license has not been revoked within the past five (5) years. The Offeror’s company has not been debarred within the past five (5) years from working on any U.S. government contracts/subcontracts. Neither the Offeror’s firm, nor any of its owners or officers have been convicted of a crime involving the awarding of the contract of a government (U.S. Federal, State, and City) construction project, or the bidding or performance of a government contract. Offeror must have an established local . The San Francisco Bay Area is defined as the following 10 counties: Santa Clara, San Mateo, San Francisco, Alameda, Contra Costa, Marin, Napa, Sonoma, Solano, and Santa Cruz Counties The Offeror must list any U.S. projects within the past five (5) years that have been terminated for default. The Offeror’s company cannot have any U.S. projects within the past five (5) years that have been terminated for default. The Offeror must have previous experience working at Department of Energy (DOE) and/or Department of Defense (DOD) Facilities SOURCES SOUGHT RESPONSE Interested firms with the skills and capability to complete the above scopes are invited to submit a written response to this Sources Sought Notice. Please provide the following information: Firm’s name Name, telephone number, and email address of a company
point of contact who has the authority and knowledge to clarify responses Please provide your response to Matt Mezzetta at [email protected] by 5 pm PST on July 1st, 2026. SOURCES SOUGHT DISCLAIMER: Please note that any responses to this sources sought posting is purely on a voluntary basis. SLAC is not requesting a proposal, any
pricing, or any other information that could be considered confidential or proprietary to be submitted in response to this posting or any part of this posting. Any submissions that contain
pricing, proprietary information, or confidential information will be discarded by SLAC. Matt Mezzetta Contracting (No Street Address
2) Menlo Park, CA 94025 USA to this opportunity. DRAFT_B2_00_RFP_Cover_Letter_FEH Optics Lab Construction.pdf DRAFT_B2_02_RFP_Section_A_(Subcontract_Form).pdf DRAFT_B2_03_RFP_Section_B_(Supplies_or_Services_and_Price_Costs).pdf DRAFT_B2_04.0_RFP_Section_C_Cover_(Specs_SOW).pdf DRAFT_B2_04.1_SOW - FEH Optics Lab Construction.pdf DRAFT_B2_04.2_B999 OPTICS LAB DESIGN.pdf DRAFT_B2_04.3_Project_Manual_B999_OPTICS_LAB_DESIGN_INCORPORATED_BY_REFERENCE.pdf DRAFT_B2_04.4_SLAC Optics Lab Structural Calculations.pdf DRAFT_B2_05_RFP_Section_F_(Deliveries_Performance).pdf DRAFT_B2_06_NTP_Submittal_Checklist.pdf DRAFT_B2_07_RFP_Section_H_(Special_Terms_Conditions).pdf DRAFT_B2_08.0_Section_J_(List_of_Attachments).pdf DRAFT_B2_08.01_DBA_WD_CA20260018_05182026_Mod_05.pdf DRAFT_B2_08.02_Sec_J_Subcontractor_IIPP_Form.pdf DRAFT_B2_08.03_0366145.pdf DRAFT_B2_08.04_Sec_J_SF1413-13g.pdf DRAFT_B2_08.05_SubcontractorFormSQF.pdf DRAFT_B2_08.06_NTP_Submittal_Checklist.pdf DRAFT_B2_08.07_Final_Inspection_Report.pdf DRAFT_B2_08.08_Final_Release.pdf DRAFT_B2_09.0_RFP_Section_K_(Rep_and_Certs_Cover).pdf DRAFT_B2_09.1_RFP_Section_K_Reps_and_Certs_Supplement_08.25.22.pdf DRAFT_B2_10.0_RFP_Section_L_Instructions_to_Offerors_FEH Optics Lab.pdf DRAFT_B2_10.1_Sec_L_FEH Optics Lab Construction_Bid_Breakdown.pdf DRAFT_B2_10.2_Sec_L_RFP_366145_RFI_Log.pdf
Get matched to contracts like this daily
Free AI-powered contract matching for your business.