Mini Split HVAC System Upgrade

Department of Defense (DoD) > U.S. Air Force > AIR COMBAT COMMANDSol: FA486126Q0018
SBFFP
est. $45K – $85K
Quick Brief

The Department of Defense is procuring HVAC installation and upgrades at Nellis Air Force Base, specifically constructing maintenance pads and installing new HVAC systems in several rooms. Key requirements include compliance with various building codes and standards, installation of electrical systems, and completion within 160 days. Proposals will be evaluated based on the lowest price technically acceptable criteria.

Generated 14h ago

Can you win this contract?

Get your fit score, win probability, and required capabilities.

Fit Score7/10Consider

Scope & Requirements

The work involves constructing maintenance pads and installing HVAC systems in multiple rooms at Nellis Air Force Base, ensuring compliance with various codes and standards.

Evaluation Criteria

  1. Lowest Price Technically Acceptable

Contract Details

Contract Typei
FFP
Estimated Value
est. $45K – $85K
Similar contracts award $13K to $123K (median $35K, 14,626 awards)Within typical range
Period of Performance
160 days
NAICS Codes
Place of Performance
Nellis Air Force Base, NV, USA
Set-Asides
SB

Qualifications & Eligibility

Set-Aside Category
N

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
DEPT OF THE AIR FORCE
Office
AIR COMBAT COMMAND

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published2d ago
Jul 23, 2026
Base Pass Request Deadlineyesterday
Jul 24, 202602:00 PM PDT
Ensure base pass request is submitted by this time.
Became Solicitationyesterday
Jul 24, 2026
Tracked
Last Updatedtoday
Jul 24, 2026
Site Visitin 10d
Aug 4, 202608:30 AM PDT
Meeting in front of building 119 main entrance. Mandatory attendance for those without base access.
Proposal Due Datein 24d
Aug 18, 202602:00 PM PDT
Response Duein 25d
Aug 18, 2026

Description

Construct and install two maintenance pads to house all condensing units and provide single line as built drawings, install a two sided screen block at the front of the building matching the existing CMU block color and style, use solid and vented CMU blocks to ensure sufficient airflow around all condensing units, and build screen block walls two rows higher than the condensing units; the contractor shall supply a weatherproof 120V maintenance receptacle for each pad, core drill the existing wall of Building 119, install a 3 inch PVC pipe sealed with acoustical seal to maintain ICD 705 compliance per Tech Spec 1.5.1, install insulation on all line sets entering Building 119, run all electrical from Room 119?s electrical mechanical room using panel EDH 1 3 rated at 480/277V and 800 amps, tie all new HVAC systems to the existing generator for backup power, surface mount electrical conduits in Room 119 and the exterior HVAC yard, run conduits underground to each maintenance pad, and supply a weatherproof disconnect for each condensing unit; the contractor shall install new cassette type HVAC systems in Rooms 112, 113, 114, and 132 using the existing suspended ceiling grid with added support, provide a 1 ton HVAC system with a separate controller for Room 112, provide 2 ton HVAC systems with separate controllers for Rooms 113 and 114, and provide a 4 ton HVAC system with a separate controller for Room 132; all design and construction shall comply with the current International Building Code, UFC standards, all applicable public laws, executive orders, CFR

requirements, DOD instructions and directives, Nellis ID2 standards, and Clark County, Nevada, and federal codes and laws, and any discrepancies between codes or standards and contract documents shall be immediately reported to the

Contracting Officer, with the more stringent requirement applying unless otherwise directed. 26 WPS request this HVAC installation and testing be accomplish within, 160 days,

period of performance. Proposals will be evaluated using lowest price, technically acceptable. A site visit will take place on 8/4/2026 at 0830 AM PDT, meeting in front of building 119 main entrance. Please ensure your base pass request has been submitted to me by 2PM PDT on 7/24/2026 if you do not have base access to Nellis AFB to ensure you have access by the date of the site visit. Proposals are due by 8/18/2026 at 2:00 PDT. Answers will be provided via a solicitation amendment. Donald Rhee Alternative

Point of Contact William Vance