ActiveOpen for Bids
Save

Replace HVAC System at Fresno Air National Guard Base

Department of Defense (DoD) > U.S. Army
FFP
est. $120K – $150K
Quick Brief

The Department of Defense is procuring a firm-fixed-price contract for the replacement of HVAC systems at the 144th Fighter Wing in Fresno, California. The project involves removing four existing HVAC units and installing a new 40-ton system along with necessary ducting and electrical lines, adhering to specific environmental constraints and security guidelines. The contractor must utilize existing building penetrations and comply with relevant construction criteria.

Generated 26d ago

Can you win this contract?

Get your fit score, win probability, and required capabilities.

Fit Score7/10Consider

Scope & Requirements

The contractor will remove and replace HVAC units and install a new system while adhering to environmental and security requirements.

Attachments

No files on SAM.gov

This listing does not include downloadable attachments. The solicitation details may be in the description below.

Verify on SAM.gov

Contract Details

Contract Typei
FFP
Estimated Value
est. $120K – $150K
Similar contracts award $13K$126K (median $35K, 14,862 awards)Above typical range
Expected Awards
1
NAICS Codes
Place of Performance
Fresno, CA, USA

Qualifications & Eligibility

Set-Aside Category
SDVOSB

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
Department of the Army National Guard Bureau

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published27d ago
May 8, 2026
Last Updated27d ago
May 8, 2026
Became Solicitation27d ago
May 8, 2026
Tracked
Became Special Notice27d ago
May 8, 2026
Tracked
Response Duein 6mo
Nov 24, 2026

Description

The 144th Fighter Wing at Fresno Air National Guard Base (ANGB) intends to award a single firm-fixed-price contract for non-personal construction services, to include all plant, labor, transportation, materials, tools, equipment, permits, and supervision necessary to remove four existing Heating, Ventilation, and Air Conditioning (HVAC) units and their auxiliary air ducting and electrical and drain lines. After all existing HVAC units have been removed, the contractor shall install a new 40-ton HVAC system, necessary ducting, electrical, and drain lines to provide for the following training equipment environmental constraints - Operating Temperature: 59 to 78 F, (15 to 26 C), Operating Humidity: 35% to 80% RH (non-condensing), Storage Temperature: 32 to 120 F, (-29 to 38 C), Storage Humidity: 20% to 80% RH (non-condensing). Services shall also include the removal and replacement of existing dust covers with custom-made roof adapters to transition from current ductwork in room serviced by the new packaged units. In order to maintain the existing security integrity of the building and comply with Intelligence Community Directive (ICD) Number 705, no new penetrations in the building are permitted. The Contractor must use existing penetrations to the maximum extent practicable. All work must also conform to Unified Facilities Criteria (UFC) 3-410-01. Site visit details are located at Section L - Instructions, Conditions, Notices to Offerors or Quoters on the SF 1442. A bid guarantee is required in accordance with provision 52.228-1 on the SF 1442. Justin Scales Alternative

Point of Contact Jarrod Sanchez

Get matched to contracts like this daily

Free AI-powered contract matching for your business.