Closed
Save

Replace Swim Dock at Sullivan Lake Campground, Washington

USDA
FFP
est. $17K – $214K

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The USDA Forest Service is procuring the replacement of a swim dock at Sullivan Lake Campground in Washington. The project involves the removal of an existing dock and the installation of a new one, with offerors required to choose between a metal frame or HDPE modular construction. The award will be based on the most advantageous quote, considering price and other evaluation factors.

Generated 30d ago

Scope & Requirements

The work involves the removal and disposal of an existing swim dock and the installation of a new replacement dock at Sullivan Lake Campground.

Evaluation Criteria

  1. Price
  2. Technical Choice

Contract Details

Contract Typei
FFP
Estimated Value
est. $17K – $214K
Similar contracts award $17K$214K (median $61K, 6,123 awards)Within typical range
NAICS Codes
Place of Performance
Metaline Falls, WA, USA

Qualifications & Eligibility

Set-Aside Category
Total Small Business

Agency & Contact

Contracting Organization

Agency
AGRICULTURE, DEPARTMENT OF

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published3mo ago
Mar 19, 2026
Last Updated3mo ago
Mar 19, 2026
Response Due2mo ago
Apr 3, 2026

Description

This solicitation replaces the previously cancelled notice 1240BD26Q0003. Upon review of the market and initial offers, the Government has determined that HDPE modular structures are a technically acceptable and highly advantageous alternative to metal-frame construction. To ensure maximum practicable competition and provide all capable vendors—including those whose previous offers did not meet the original metal-only specification—an opportunity to bid on this revised requirement, the Government is re-soliciting this project.

  • (i) This is a combined for commercial products or commercial services prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice.
  • (ii) Description of Requirement: The USDA Forest Service, Colville National Forest, requires the removal and disposal of an existing swim dock and the furnishing and installation of a new replacement at Sullivan Lake Campground. Technical Choice: Offerors must select and quote only ONE material option: Option 1 (Metal Frame) or Option 2 (HDPE Modular). Location: Sullivan Lake Campground, Metaline Falls, WA. Evaluation: Award will be made to the responsible offeror whose quote, conforming to the solicitation, is the most advantageous to the Government, price and other factors considered. The Government will use comparative evaluation procedures per FAR 12.602. Mindy Hickman Contracting (No Street Address

2) Portland, OR 972042829 USA to this opportunity. Attachment 1_PWS_DOCK_1240BD26Q0026.pdf

Get matched to contracts like this daily

Free AI-powered contract matching for your business.