The response deadline has passed. Review the details for future reference or to track similar opportunities.
The Department of Defense is procuring sewer pipe repair services for Building 20 at Stratton Air National Guard Base, Scotia, NY. The project is a small business set-aside under NAICS 237110 with a budget of less than $25,000.
Repair of the sewer pipe for Building 20 at Stratton Air National Guard Base, including coordination with facilities to reduce usage during maintenance.
Project Title: Bldg. 20 Sewer Pipe Repair Project Location: Stratton Air National Guard Base, Scotia, NY Project Number: VBDZ262101. Reference attached statement of work (SOW) for project details. This is a total small business set-aside for NAICS 237110, water and sewer line and related structures construction with a small business size standard of $45M. The magnitude of this project is less than $25,000. Reference 52.212-2 Evaluation-Commercial Products and Commercial Services. (Deviation) for the quote evaluation factors. Quotes shall be submitted via email to the following address: [email protected]. mil A site visit will be held on March 19, 2026, at 10:00 am. All attendees will meet at the civil engineering building (bldg. 25), 1 Air National Guard Road, Scotia, NY 12302. Interested parties should confirming their intent to attend the site visit. In addition to a valid, government issue photo id, attendees should be prepared to present the following information upon arrival at the gate: Vehicle registration, Real id (see https://www.tsa.gov/travel/security-screening/identification) for acceptable forms of id, Proof of vehicle insurance, Safety inspection and car rental agreement if applicable Q&A from
24 March 2026: 1. How deep is the sewer line? Answer: Between 6-7 feet based off our locator 2. What size and material is it made of? Answer: 6” SDR. 3. What kind of flow should we figure for? Answer: 2 buildings run through it, but we will coordinate with the facilities on the day of maintenance and try to schedule an alternate work schedule day to reduce use. 4. Are OSHA 10hr required? Answer: No, we do not require OSHA 10hr. Joshua King to this opportunity. Solicitation - W50S8J26QA011.pdf SOW VBDZ262101 Bldg 20 Sewer Pipe Repair.docx
Get matched to contracts like this daily
Free AI-powered contract matching for your business.