The response deadline has passed. Review the details for future reference or to track similar opportunities.
The Department of Health and Human Services is contracting for the remediation of the Lame Deer Heliport and associated concrete support structures at the Northern Cheyenne Health Center in Lame Deer, Montana. The project involves complete demolition and replacement of the heliport, structural concrete remediation, and installation of various systems to restore operational capacity, with a construction duration of 120 days. The estimated value of the project is between $1,000,000 and $5,000,000.
The project includes demolition and replacement of the heliport, structural remediation of support systems, and installation of lighting and HVAC systems.
The existing heliport at the Northern Cheyenne Health Center in Lame Deer, Montana is failing due to concrete cracking and spalling and requires complete replacement. The facility’s structural support systems for the ambulance bay, emergency entrance, and loading dock have also failed and require remediation to restore full operational capacity. The project includes the full demolition and replacement of the existing heliport along with structural concrete remediation work at the ambulance bay, emergency entrance, and loading dock. Major elements of work include: o Demolition, reconstruction, and commissioning of the medical facility’s heliport, including all associated airfield concrete work; o Construction of sidewalks and ramps for patient transport between the heliport and the facility; o Installation of an electrical lighting system suitable for nighttime and low-visibility helicopter operations; o Replacement of the heliport safety fence, access gates, and associated site improvements; o Structural concrete remediation including installation of new beams, columns, and concrete flooring for the ambulance bay and drive, emergency entrance, and loading dock; o Installation of a crawlspace HVAC system to reduce humidity levels. LOCATION OF PROJECT: All work shall be performed at the Northern Cheyenne Health Center at 420 Cheyenne Ave, Lame Deer, MT 59043 TERO: TERO fees do apply. CONSTRUCTION DURATION:
Period of Performance is 120 calendar days from issuance of the Notice to Proceed. CONSTRUCTION MAGNITUDE: The magnitude of this construction project is anticipated to be between $1,000,000 and $5,000,000. SITE VISIT: See Section L.5 in the solicitation document. PSC/NAICS: The type of work to be performed will be categorized under PSC code Y1BZ, Construction Of Other Airfield Structures and NAICS code 237310 Highway, Street, and Bridge Construction with a size standard of $45 million. SET ASIDE: This solicitation is being issued as Unrestricted, Full and Open Competition. Matt D Sanders Alternative
E. Hart Contracting -24 SEATTLE, WA 98121 USA to this opportunity. Attachment J07 Past Performance Questionnaire.docx Attachment J06
Key Personnel Resume Form.docx Attachment J05 Company Technical Experience Construction Form.docx Attachment J04 Self-Performed Calculation Sheet.docx Attachment J03 Wage Determination MT20260080.pdf Attachment J02.2 Lame Deer Specifications Volume 2.pdf Attachment J02.1 Lame Deer Specifications Volume 1.pdf Attachment J01 Lame Deer Construction Plans.pdf
Get matched to contracts like this daily
Free AI-powered contract matching for your business.