Closed
Save

Install Three Different Wall Signage

Dept. of Energy > Fermi National Accelerator Laboratory
est. $5.0M – $45M

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of Energy's Fermi National Accelerator Laboratory (Fermilab) is requesting proposals for the supply and installation of 3 wall signages in 3 different locations (HEERC, D0, SBN). The project is a small business set-aside.

Generated 57d ago

Scope & Requirements

Supply and installation of 3 wall signages in 3 different locations (HEERC, D0, SBN) at Fermilab. Includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision.

Deliverables

  • 3 wall signages installed in specified locations

Contract Details

Awarded Amount
est. $5.0M – $45M
Similar contracts award $9K$69K (median $21K, 2,254 awards)Above typical range
NAICS Codes
Place of Performance
Batavia, IL, USA

Qualifications & Eligibility

Set-Aside Category
Total Small Business Set-Aside

Agency & Contact

Contracting Organization

Agency
ENERGY, DEPARTMENT OF
Sub-Agency
Fermi National Accelerator Laboratory

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Amendment 01 Issued4mo ago
Feb 3, 2026
Became Award Notice4mo ago
Feb 3, 2026
Tracked
Proposal Due4mo ago
Feb 6, 202617:00:00
CT
Response Due2mo ago
Apr 1, 2026

Description

On 2/3/2026 Amendment 01 was issued to answer the Q&A and provide an additional drawing document. See attached files for more. Fermi National Accelerator Laboratory (FNAL) is requesting proposals for the supply and installation of 3 Signages in 3 different locations (HEERC, D0, SBN).. The project is located on the Fermi National Accelerator Laboratory (Fermilab) Site, adjacent to the city of Batavia, Illinois. The project is in Du Page County. The Subcontractor shall furnish all required supervision, labor, materials, tools, and equipment necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings and technical specifications. For more detailed information, please review the attached SOW entitled, “Exhibit C - Statement of Work- Wall Signage.” Proposals are due 02/06/2026 at 5pm CT. Brett Buzzelli Contracting . & Pine St. (No Street Address

2) Batavia, IL 60510 USA to this opportunity.

Questions for Req 377679 3 New Signages.docx Exhibit D - FWAC Signage.pdf Amendment 01 to RFQ 377679.pdf

Get matched to contracts like this daily

Free AI-powered contract matching for your business.