ActiveOpen for Bids
Save

Architectural Engineering Services for New Medical Center in San Antonio

Department of Defense (DoD)
HUBZoneSDBSDVOSBWOSBTBD
$72K – $885K per task order
Quick Brief

The Department of Defense is procuring architectural engineering services for the Veterans Affairs New Medical Center in San Antonio. The procurement requires the submission of a minimum of five projects demonstrating relevant experience, with specific details about the work performed, design completion, and project costs. Only projects completed after June 2016 will be considered, and each project must meet the defined criteria for evaluation.

Generated 16d ago

Can you win this contract?

Get your fit score, win probability, and required capabilities.

Fit Score7/10Consider

Contract Details

Contract Type
TBD
Contract Vehiclei
IDIQ
Contract Value
$72K – $885K per task order
IDIQ ceiling: $90M
Similar contracts award $72K to $885K (median $262K, 101,961 awards)
NAICS Codes
Set-Asides
HUBZone, SDB, SDVOSB, WOSB

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published17d ago
Jul 8, 2026
Last Updated17d ago
Jul 8, 2026
Became Solicitation16d ago
Jul 8, 2026
Tracked
Response Duein 5d
Jul 30, 2026

Description

A minimum of five projects for the proposed team (including joint ventures and teaming partners) may be shown in Part I, Section

F. Each project is limited to two pages. Additional projects may be submitted provided the overall page limit for the SF 330 is not exceeded. A “project” is defined as work performed at one site or a single installation/campus. An Indefinite Delivery Contract (IDC) will not be considered a “project” for the purposes of evaluation, unless it is for phased work performed at one site or a single installation/campus. Individual Task Order contracts awarded from an IDC contract will only be considered as a single project, regardless of the number of facilities and/or the range of the

scope of work (i.e. a single Task Order contract cannot be submitted as multiple projects for the submission

requirements in this synopsis.) If the offeror provides a specific task order a project, it should provide the base contract number and the task order number for reference purposes. Project descriptions shall clearly state extent of work performed by the team, extent of design completed (for instance, preparation of design-build package; 100% design; etc.), dates of completion for design and construction, project category type (new/renovation), design fee, and estimated or actual construction costs. Clearly cite whether the experience is that of the prime (or joint venture), Designer of Record (DOR) for Design-Build (DB), consultant or an individual for each project in Part I, Section

F. Work cited that is experience of the prime (or joint venture) from an , Section C should be so labeled. Projects (or phases of projects) with design completed before June 2016 will not be considered. Project (or phases of projects) for which design is not complete will not be considered. A “completed” design is defined as ready for construction (Ready to Advertise (RTA) for Design-Bid-Build (DBB) or released for construction for Design-Build (DB), Integrated Design and Construction (IDAC) or similar construction method).

Get matched to contracts like this daily

Free AI-powered contract matching for your business.