The response deadline has passed. Review the details for future reference or to track similar opportunities.
The Department of Defense is procuring an Air Cooler Assembly (COOLER,AIR ASSY) for the Navy's NAVSUP Weapon Systems Support. Key requirements include firm fixed pricing, military packaging, and government-source inspection and acceptance.
The contract includes requirements for the manufacture of the Air Cooler Assembly, including quality requirements and compliance with specific military standards.
This listing does not include downloadable attachments. The solicitation details may be in the description below.
Verify on SAM.gov|4|N712.11|GPK|717-605-5192|[email protected]| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|COMBO||NA|N00104|NA|NA|SEE SCHEDULE|SEE SCHEDULE|||NA|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(FEB 2026))|2||| CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEVIATION 2026-O0015)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||| AMENDMENT IS TO CORRECT DELIVERY FROM FOB DESTINATION TO FOB SOURCE. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME. This solicitation is issued pursuant to Emergency Acquisition Flexibilities (EAF). CASREP ACCELERATED DELIVERY IS ENCOURAGED AND ACCEPTED AT NO ADDITIONAL COST TO GOVERNMENT. Please provide the following information: Unit Price:__________ FIRM Total Price:__________ FIRM Procurement Turnaround Time (PTAT) :__________ Awardee CAGE: __________ Inspection & Acceptance CAGE, if not at source:__________ The resultant award of this solicitation will be issued bilaterally,requiring the contractor's written acceptance prior to execution. Please quote a firm fixed price for the item. Do NOT include the cost forshipping material. Freight is FOB Origin. DCMA source inspection and acceptance is required. Required shipping procedure is military packaging and bar coding. Government-Source Inspection and Acceptance (G-S I&A) is required. If theG-S I&A will occur at a different CAGE from the Admin Award CAGE, pleaseprovide the procurement facility CAGE and/or packaging CAGE with the quote. PLEASE ALSO NOTE THAT DUE TO BEING A FIRST TIME PROCUREMENT BY THE NAVY WE AREREQUESTING AN INFORMAL COST BREAKDOWN AND/OR REDACTED SALES RECEIPT TODETERMINE QUOTATION FAIR AND REASONABLE. \ 1. SCOPE 1.1 This contract/purchase order contains the
requirements for manufacture and the contract quality
requirements for the COOLER,AIR ASSY . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 3.
REQUIREMENTS 3.1 Cage Code/Reference Number Items - The COOLER,AIR ASSY furnished under this contract/purchase order shall be the design represented by Cage Code(s) reference number(s). Cage _______ ref. no. ;0ASU6 E 009100-01; 3.2 Marking - This item shall be physically identified in accordance with ;MIL-STD-130, REV N,
16 NOV 2012; . 3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH
Contracting Officer has notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation. When notifying the Procurement
Get matched to contracts like this daily
Free AI-powered contract matching for your business.