ActiveOpen for Bids
Save

Remote Generator Monitoring System Installation

Department of Defense (DoD) > U.S. Air ForceSol: A065363
est. $130K – $325K
Quick Brief

The Department of Defense is procuring a remote generator monitoring system for Joint Base Charleston to enhance base resiliency and ensure mission continuity. This project involves the installation of a monitoring system for 65 generators across four locations, integrating with the existing EMCS architecture to provide real-time notifications of electrical or generator failures. Key requirements include compatibility with existing systems and the capability for rapid response to power disruptions.

Generated 10d ago

Can you win this contract?

Get your fit score, win probability, and required capabilities.

Fit Score7/10Consider

Contract Details

Estimated Value
est. $130K – $325K
Similar contracts award $257 to $34K (median $4K, 8,797 awards)Above typical range
NAICS Codes
Place of Performance
Joint Base Charleston

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
DEPT OF THE AIR FORCE AIR MOBILITY COMMAND

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Became Presolicitation11d ago
Jul 12, 2026
Tracked
Became Sources Sought11d ago
Jul 12, 2026
Tracked
Became Solicitation11d ago
Jul 12, 2026
Tracked
Published11d ago
Jul 13, 2026
Last Updated11d ago
Jul 13, 2026
Response Datein 3d
Jul 27, 202614:00
Response Duein 4d
Jul 27, 2026

Description

Joint Base Charleston is seeking manufactures of remote generator monitoring systems and associated services. See

attachments for specifics. This project will procure and install a remote monitoring system for 65 generators across Joint Base Charleston's four geographically separated locations. This system is a data acquisition platform and will be integrated into the existing EMCS architecture, providing instant, centralized notification of any electrical or generator failures. This directly enhances base resiliency by replacing slow, manual inspection processes with real-time situational awareness, allowing for rapid response to power disruptions and ensuring mission continuity. The MP has provided that 18 generator systems have confirmed communication capability compatible with Monico integration. An additional 7 units are believed to be compatible but require additional discovery and confirmation. Approximately 40 units have been identified as older Cummins generators which may or may not currently have the required Cummins network cards and commissioned Cummins ProtoNode gateways installed and operational. Jeffrey Krieger Alternative

Point of Contact Roger "Dale" Crews to this opportunity.

Get matched to contracts like this daily

Free AI-powered contract matching for your business.