The response deadline has passed. Review the details for future reference or to track similar opportunities.
The U.S. Army Corps of Engineers is seeking vendors for the Coos Bay Pier Utilities upgrade, which involves removing and replacing existing utilities on and around a pier in Coos Bay, OR. Key requirements include installing potable water piping, electrical conduits, and other related infrastructure, with work expected to occur from October 2026 to March 2027.
The project involves upgrading utilities on and around a pier, including potable water piping and electrical systems.
This listing does not include downloadable attachments. The solicitation details may be in the description below.
Verify on SAM.govSources Sought: USACE, Portland District: W9127N26BA022 Coos Bay Pier Utilities Upgrade This announcement is a Sources Sought Synopsis (market survey). This is not a Request for Proposal (RFP). This announcement is not a commitment by the Government, implied or otherwise, to issue a solicitation or award a contract. The purpose of this Sources Sought is to determine interested parties, socioeconomic status availability, capabilities, and qualifications. The Government intends to use responses to this sources sought synopsis to make appropriate acquisition decisions for future pier utility upgrade
requirements. The U.S. Army Corps of Engineers (USACE) – Portland District is requesting your help in identifying vendors with the capability and availability to remove and replace existing utilities on and around a pier in Coos Bay, OR, including potable water piping, connections, and fittings on the pier, valves, valve box, and pipe supports on shore, 120V, 240V, & 480V conduit, cabling, receptacles, and switches on the pier, circuit breakers on shore with underground conduit, on shore light posts, 4x4 and 2x4 wooden railing along the pier, procuring ladder access onto a floating dock, and replacing a life ring compartment attached to piping. This work requires a small amount of ground disturbance, work on top and along the pier, beneath the pier via boat access, and certified testing of all the newly installed systems. Work will be conducted from approximately
01 October 2026 –
31 March 2027. SUBMISSION
REQUIREMENTS FOR RESPONSES TO THIS SOURCES SOUGHT SYNOPSIS Vendors interested in this requirement(s) with Portland District must submit the documentation and meet the