ActiveOpen for Bids
Save

Plumbing Repairs For Phoenix Rearing Facility

USDA > Animal & Plant Health Inspection ServiceSol: 12639526Q0197
SB
est. $15K – $65K
Quick Brief

The Department of Agriculture is procuring plumbing repairs for the Phoenix Rearing Facility, which is part of a pest control project aimed at reducing crop damage from insects. Key requirements include addressing various plumbing issues such as backed-up sinks, frequent urinal backups, and persistent odors in specific areas of the facility, with a period of performance set for 180 days after the Notice to Proceed.

Generated 2d ago

Can you win this contract?

Get your fit score, win probability, and required capabilities.

Fit Score7/10Consider

Scope & Requirements

The work involves plumbing system repairs and replacements as detailed in the construction documents.

Contract Details

Estimated Value
est. $15K – $65K
Similar contracts award $13K to $123K (median $35K, 14,626 awards)Within typical range
Period of Performance
180 days after Notice to Proceed
NAICS Codes
Set-Asides
SB

Qualifications & Eligibility

Set-Aside Category
8(a)

Agency & Contact

Contracting Organization

Agency
AGRICULTURE, DEPARTMENT OF
Sub-Agency
Animal and Plant Health Inspection Service

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published3d ago
Jul 22, 2026
Became Solicitation2d ago
Jul 22, 2026
Tracked
Last Updatedyesterday
Jul 24, 2026
Offers Duein 16d
Aug 10, 2026
Response Duein 17d
Aug 10, 2026

Description

The Phoenix Rearing Facility (PRF) focuses on the Sterile Insect Technique (SIT). The facility collaborates with farmers to decrease the number of insects that damage crops by using SIT. The PRF is part of a larger pest control project aimed at reducing the impact of navel orange worms on American agriculture. Constructed around 1973, the 69,000 square-foot, one-story building includes , employee break areas, laboratories, process rooms, environmental rooms and chambers, warehouse, maintenance, and utility areas. The building was renovated for its current use in 1994. Plumbing issues include: A backed‑up sink in the south men’s restroom Frequent urinal backups in the north men’s restroom Recurring clogs in maintenance shop sink, mechanical room, outdoor drains, and vents Persistent odors in the QC clean lab sink area These deficiencies require plumbing system repairs and replacements described in the construction documents. Amendment 0001 is posted below. Amendment 0002 is posted below. It corrects the closing date for quotes--August 10. The solicitation document has been replaced. The page numbering of the original was incorrect and is now fixed. Amendment 0003 posted below establishes a

period of performance of 180 days after Notice to Proceed. Site visit attendance is posted below. Jim Roloff to this opportunity. Attendance_07212026 site visit.pdf 12639526Q0197-0003.pdf C04_12639526Q0197.docx 12639526Q0197-0002.pdf 12639526Q0197-0001.pdf C04_Atch 4_Federal Construction Wage Rates_Maricopa.txt C04_Atch 3_ Drawings.pdf C04_Atch 2_Specifications.pdf

Get matched to contracts like this daily

Free AI-powered contract matching for your business.