The Department of the Air Force is procuring the refurbishment of the wash rack floor at Vance Air Force Base in Oklahoma, requiring removal of existing concrete, installation of new epoxy-coated flooring, and compliance with military facility standards for durability and chemical resistance.
Get your fit score, win probability, and required capabilities.
Refurbishment of the wash rack floor including demolition of existing concrete, preparation of subgrade, and installation of industrial-grade epoxy-coated flooring to meet Air Force facility standards.
No description available
Get matched to contracts like this daily
Free AI-powered contract matching for your business.