ActiveOpen for Bids
Save

Streambank Stabilization for Sharon and Ohley Hollow Roads

USDA > Farm Production & Conservation Business CenterSol: 12FPC326B0010
SBFFP
est. $100K – $500K
Quick Brief

The Department of Agriculture is contracting for streambank stabilization in Ohio County, specifically at Sharon Hollow and Ohley Hollow Road. The project involves clearing designated areas, controlling erosion, preparing the area for treatment, and ensuring safe public road use during construction. Key requirements include excavation, construction of earth embankments, and the installation of temporary water containment facilities.

Generated 16d ago

Can you win this contract?

Get your fit score, win probability, and required capabilities.

Fit Score7/10Consider

Scope & Requirements

The work includes clearing designated areas, controlling erosion, and preparing the area for treatment through various construction activities.

Contract Details

Contract Typei
FFP
Estimated Value
est. $100K – $500K
Similar contracts award $44K$1.1M (median $204K, 8,719 awards)Within typical range
NAICS Codes
Place of Performance
Washington, DC, USA
Set-Asides
SB

Qualifications & Eligibility

Set-Aside Category
Total Small Business

Agency & Contact

Contracting Organization

Agency
AGRICULTURE, DEPARTMENT OF
Sub-Agency
FARM PRODUCTION AND CONSERVATION BUSINESS CENTER

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published17d ago
May 18, 2026
Became Solicitation16d ago
May 18, 2026
Tracked
Last Updated15d ago
May 20, 2026
Response Duein 14d
Jun 17, 2026

Description

Please see

attachments and comibined synopsis solicitaiton for further deatails. Ohio County EWP 5091-001 Streambank Stabilization Sharon Hollow and Ohley Hollow Road for USDA NRCS-WV. The project consists of clearing designated areas by the removal and disposal of trees, logs, stumps, shrubs, brush, and rubbish and the shaping of the channel. Installing measures or performing work to control erosion and minimize the production of sediment and other pollutants to water and air from construction activities. Preparing the area for treatment; furnishing and placing seed, sprigs, mulch, fertilizer, inoculant, lime, and other soil amendments; and anchoring mulch in designated areas as specified. The work consists of the mobilization and demobilization of the contractor’s forces and equipment necessary for performing the work required under the contract. Establishing traffic control and maintaining safe, convenient use of public roads and right of way. Removal of surface water and ground water as necessary to perform the construction required by the contract in accordance with the specifications. It must include: (1) constructing, installing, building, and maintaining all necessary temporary water containment facilities, channels, and diversions; (2) furnishing, installing, and operating all necessary pumps, piping, and other facilities and equipment; and (3) removing all such temporary works and equipment after their intended function is no longer required. Excavation required by the drawings and specifications, as well as the disposal of the excavated materials. Construction of earth embankments, other earthfills, and earth backfills required by the drawings and specifications. See Specifications document attached to posting for full details of required work. Mark Domingo Contracting -ACQ DIV 1400 INDEPENDENCE AVE SW WASHINGTON, DC 20250 USA to this opportunity. 12FPC326B0010 IFB Combined Synopsis.pdf Attachment 4 - OhleyHollowRd Drawings.pdf Attachment 3 - SharonHollowRd Drawings.pdf Attachment 2 WD WV20250073 1-2-2026.pdf Attachment 1 -Construction Specifications.pdf 12FPC326B0010 IFB Combined Synopsis.pdf (deleted)

Get matched to contracts like this daily

Free AI-powered contract matching for your business.