ActiveOpen for Bids
Save

Basketball Court Reconstruction at U.S. Tri-Mission Marine House in Vienna

State DepartmentSol: 19AU9026Q0010
est. $17K – $211K
Quick Brief

The Department of State is procuring the reconstruction of a basketball half-court at the U.S. Tri-Mission Marine House in Vienna, Austria. Key requirements include demolition of the existing court, soil removal, and construction of a new court with specific dimensions, while ensuring minimal disturbance to residents and compliance with USG security regulations.

Generated 24d ago

Can you win this contract?

Get your fit score, win probability, and required capabilities.

Fit Score7/10Consider

Scope & Requirements

The project involves the demolition of the existing basketball half-court, soil removal, and the construction of a new court with specific dimensions and features, ensuring compliance with security regulations.

Contract Details

Estimated Value
est. $17K – $211K
Similar contracts award $17K to $211K (median $60K, 5,900 awards)Within typical range
NAICS Codes
Place of Performance
Vienna, Austria

Agency & Contact

Contracting Organization

Agency
STATE, DEPARTMENT OF

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published26d ago
Jun 29, 2026
Became Solicitation25d ago
Jun 29, 2026
Tracked
Last Updated23d ago
Jul 1, 2026
Response Duein 5d
Jul 29, 2026

Description

This solicitation is for reconstruction of the basketball half-court at the U.S. Tri-Mission Marine House in Vienna, Austria. The work includes but is not limited to the following tasks – all as specified in the attached Statement of Work: Demolition Demolition, removal and disposal of existing basketball half- court (asphalt layer 7x8m), existing exterior lights and basketball basket with posts Soil removal and disposal for new basketball half- court dimension (13mx14m = 182m²), 0.3m depth = ~55m³ RConstruction of a new sport field Preparation/installation subgrade/subbase incl. drainage Installation top layer (EPDM rubber surface or equal) Installation point foundation for 1 basketball hoop and for 2 light poles Installation 1 adjustable basketball hoop, and 2 exterior lights incl. cabling/rewiring Laying stone slabs 40x40x5cm around the court Painting lines Final cleaning Special

requirements: The work will be carried out while the facility remains in operation and in the presence of the residents, who should not be disturbed during the construction work USG Security regulations Clearance process for employees, cars, material on site Safety and protective measures Zahid Raja Alternative

Point of Contact Daniel Worel Contracting , 2201 C ST NW (No Street Address

2) WASHINGTON, DC 20520 USA to this opportunity. 19AU9026Q0010_Solicitation Doc.pdf 19AU9026Q0010_cover letter.pdf 19AU9026Q0010_SOW_de.pdf 19AU9026Q0010_SF-1442.pdf

Get matched to contracts like this daily

Free AI-powered contract matching for your business.